My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-04-27 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2005
>
2005-04-27 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2009 10:55:26 AM
Creation date
7/21/2009 10:53:55 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />INTERCHANGE RAMP INTERSECTION VOLUME TO CAPACITY <br />(1) RATIOS FOR THE YEAR 2030 PEAK HOUR FORECASTS <br /> <br />ALTERNATE INTERCHANGE AM PEAK HOUR PM PEAK HOUR <br /> TYPE <br /> West East West East Ramp <br /> Ramp Ramp Ramp (4) (5) <br />1 DIAMOND .91 .79 .76 .88 .86 <br />2 DIAMOND .53 .60 .68 .88 .74 <br /> + NW LOOP (2) <br />3 DIAMOND .75 .60 .90 .88 .74 <br /> +NW LOOP <br /> -SW RAMP (2) <br />4 PARCLO A (2) .47 .51 .68 .88 .74 <br />5 PARCLO B .91 .71 .68 .88 .58 <br />6 SPill .91 (3) .88 (3) .69 <br />7 SUPER DIAMOND .91 .50 .61 .72 .64 <br />8 FOLDED AIB south .91 .52 .64 .88 .74 <br />9 FOLDED BfA north .47 .65 .68 .88 .74 <br /> (2) <br />10 FOLDED BfA .56 .65 .68 .88 .53 <br /> With inverted loop <br /> (2) <br /> <br />Notes: <br /> <br />1. Capacity is assumed to be at a critical lane volume of 1400 vehicles per hour. <br />(Highway Capacity Planning Level Analysis) <br />2. Local traffic from the southwest quadrant has not been generated and applied to <br />those alternatives with a south leg at the west ramp. Much of that traffic is <br />already included in the ramp inter section volumes as through vehicles to and <br />from the west. <br />3. There is only one ramp intersection with this design. <br />4. The east ramp volume to capacity ratio is the sum of the eastbound through and <br />the northbound right-turn volumes. For Alternate 7, 3 eastbound lanes are <br />assumed. <br />5. This is the volume to capacity ratios for the other conflicting movements at the <br />east ramp intersection during the PM peak hour. <br /> <br />, <br />L____ <br />
The URL can be used to link to this page
Your browser does not support the video tag.