Laserfiche WebLink
<br />" <br /> <br />~ ~.. Bon est roo <br />R Rosene <br />'till Anderlik & <br />'V, Associates <br />Engineers & Architects <br /> <br />Owner: Citv of Centerville, 1880 Main St., Centerville, MN 55038 Date Anrill, 2005 <br />. <br />Contractor: American Tank Services Inc. DBA Holte Contractin. 3174 Rvan Ln., St. Paul, MN 55117 <br /> . <br />Bond Comoanv: Bond No: 240160 <br /> <br />CHANGE ORDER NO. 1 <br />POND AND DITCH IMPROVEMENTS <br />BRA FILE NO. 616-04-140 <br /> <br />Descriotion of Work <br />This Change Order provides for !he elimination of !he proposed ditch at !he City Public Works site and !he iostallation of <br />8" PVC storm pipe and two shallow catch basins instead. <br /> <br />No. <br /> <br />1 <br />2 <br />3 <br /> <br />4 <br /> <br />61604HOCH01.x1s <br /> <br />Item <br />CHANGE ORDER NO.1, ADD <br />8"PVC <br />CATCH BASIN <br />RIP RAP CLASS 3 <br />TOTAL CHANGE ORDER NO. I, ADD <br /> <br /> Contract Unit <br />Unit Quantity Price <br />LF 190 $17.95 <br />EA 2 $1,598.73 <br />CY 1 $150.00 <br /> <br />$3,410.50 <br />$3,197.46 <br />$150.00 <br />$6,757.96 <br /> <br />Total <br />Amount <br /> <br />CHANGE ORDER NO.1, DEDUCT <br />DITCH EXCAVATION <br />TOTAL CHANGE ORDER NO. I, DEDUCT <br /> <br />LF <br /> <br />250 <br /> <br />-$6.60 <br /> <br />($1.650.00) <br />($1,650.00) <br /> <br />TOTALCHANGEORDERNO.l,ADD <br />TOTAL CHANGE ORDER NO. 1, DEDUCT <br />Total CHANGE ORDER NO.1: <br /> <br />$6,757.96 <br />($1,650.00) <br />$5,107.96 <br /> <br />RECEIVED <br />APR 0 6 2005 <br />