Laserfiche WebLink
<br /> Unit Quantity Quantity <br /> No. llem Unit Quantity Price This Period To Date Amount <br /> BASE BID B - PEDESTAL SPHEROID <br /> CONSTRUCTION: <br /> 6 500,000 GALLON STEEL FLUTED COLUMN <br /> WATER TOWER- TOTAL BASE BID A LS 1 $837,195.00 <br /> Breakdown of Base Bid B <br /> 6a Design DraWings LS 1 $25,000 100.0% $25,000.00 <br /> 6b Foundation LS 1 $210,000 100.0% $210,000.00 <br /> 6c Sleel Fabricated to Site LS 1 $235,895 100.0% $235,895.00 <br /> 6d Field Erection LS 1 $138,000 5.0% 100.0% $138,000.00 <br /> 6e Field Painting LS 1 $190,000 $0.00 <br /> Sf Field Electrical LS 1 $30,000 $0.00 <br /> 6g Cathodic Protection LS 1 $8,300 $0.00 <br /> Total Breakdown $608,895.00 <br /> FOUNDATION PILING - BASE BID B - PEDESTAL <br /> SPHEROID PILING: <br /> 16 9-5/8" DIA. CAST-IN-PLACE CONCRETE TEST PiLE EA 2 $1,600.00 2 $3,200.00 <br /> 17 9-5/8" DIA CAST-IN-PLACE CONCRETE PILING, <br /> DRIVEN LF 2080 $17.00 2061 $35,037.00 <br /> TOTAL FOUNDATION PILING $38,237.00 <br /> SITE WORK: <br /> 20 SALVAGE AND REINSTALL CHAIN LINK FENCE LF 24 $29.15 24 $699.60 <br /> 21 SALVAGE, STOCKPILE, AND RESPREAD TOPSOIL LS 1 $100.00 1 $100.00 <br /> 22 REMOVE WATER MAIN LF 114 $10.00 114 $1,140.00 <br /> 23 REMOVE STREET SWEEPING MATERIAL CY 220 $5.00 $0.00 <br /> 24 SILT FENCE, REGULAR LF 600 $3.00 588 $1,764.00 <br /> 25 6' HIGH CHAIN LINK FENCE LF 135 $18.45 $0.00 <br /> 26 20' WIDE DOUBLE SWING GATE EA 1 $1,030.00 $0.00 <br /> 27 TYpE 41 BITUMINOUS FOR DRIVEWAYS TN 40 $40.00 $0.00 <br /> 28 TYPE 31 BITUMINOUS BASE COURSE TN 50 $40.00 $0.00 <br /> 29 AGGREGATE BASE, CLASS 5,100% CRUSHED TN 700 $20.00 $0.00 <br /> 30 GEOTEXTILE FABRIC, TYPE V SY 360 $2.00 $0.00 <br /> 31 CONNECT TO EXISTING WATER MAIN EA 2 $500.00 2 $1,000.00 <br /> 32 16" PVC WATER MAIN LF 270 $45.00 286 $12,870.00 <br /> 33 16" DIP WATERMAIN, CLASS 52, INCL. POLY LF 115 $40.00 110 $4,400.00 <br /> 34 6" DIP WATER MAIN, CL. 52, INCL. POLY WRAP LF 10 $25.00 18.S $462.50 <br /> 35 6" GATE VALVE AND BOX EA 1 $650.00 2 $1,300.00 <br /> 3612"GATEVALVEANDBOX EA 1 $1,500.00 1 $1,500.00 <br /> 3716"GATEVALVEANDBOX EA 1 $4,000.00 1 $4,000.00 <br /> 38 CAST IRON FmlNGS LB 2065 $2.00 3089 $6,178.00 <br /> 39 INSTALL HYDRANT EA 1 $1,800.00 1 $1,800.00 <br /> 40 OVERFLOW MANHOLE EA 1 $2,500.00 1 $2,500.00 <br /> 41 15" RCP STORM SEWER LF 120 $30.00 104 $3,120.00 <br /> 42 15" RCP FLARED END SECTION EA 1 $500.00 1 $500.00 <br /> 43 CLASS III RIPRAP, PLACED AT FLARED END <br /> SECTION CY 5 $100.00 5 $500.00 <br /> 44 MNDOT SEED MIX 70A AC 0.2 $5,000.00 $0.00 <br /> 45 WOOD FIBER BLANKET SY 500 $5.00 $0.00 <br /> TOTAL SITE WORK $43,834.10 <br /> TOTAL BASE BID B $608,895.00 <br /> TOTAL FOUNDATION PILINGS $38,237.00 <br /> TOTAL SITE WORK $43,834.10 <br /> TOTAL WORK COMPLETED TO DATE $690,966.10 <br /> MATERIALS ON HAND: <br />I None $0.00 <br /> TOTAL STORED MATERIALS $0.00 <br />I <br /> I 61603130 RSQ 7 <br /> l <br />