Laserfiche WebLink
<br />a. Finished grading ,contours. uattheu~ interyalas / 1-, """",,, <br />provided above or as required to clearly indicate the <br /> <br />:::~~~:;:e~~m~:~~~r3n~ <i=:~-' <br />built; <br /> <br />j). u u A udrainage I,lan of the developed site delineating ill <br />which direction and at what rate stonnwater will be <br />conveyed from the site and setting forth the areas of the <br />site where stonnwater will be allowed to collect; <br /> <br />#, u. The proposed Size, alignments and il:JUmded useof anY <br />structures to be erected on the site; <br /> <br />,g. <br /> <br />A clear delineation and tabulation of aU areas which <br />u sIi3II be PaVed or sUrfuCed, inclUdiDg a dCsCri!'fion (If <br />the surfacing material to be used; <br /> <br />~, u. Cop)'of MPCA Pennit Nwnberfor discharging stonnwater . <br />from construction activity (MN RlOOOO I). <br /> <br />5. CoP' of Rice Crcck Watershed Permitand snbmittal information. <br /> <br />79.08 Stonnwater pollution \)Tevention ulan review process <br /> <br />A. <br /> <br />~. Stonnwater pollution prevention plans meeting the <br />requirements of Section 79.07 and minimum BMP requirements of <br />Section 79.09 will be reviewed by the Zoning Administrator--.m: <br />gcsginee MQ, mayapprove, approve with conditions, or denyu the <br />stonnwater pollution prevention pIall. If the stonnwateruPollution <br />prevention plan is part of a large subdivision, the ,Citv may require the <br />Swppp be reviewed by the Cili'.. Engine~!;. . following Planning <br />Conunission action, the stormwater pollution prevention plan shall be <br />submitted to the ,CitvCouncil. . City Council action on the stormwater <br />pollution prevention plan must be accomplished within 120 days <br />following the date the application for approvaf is filed with the ,City . <br /> <br />Duration. Approval of a plan submitted under the provisions of this <br />ordinance shall expire one year after the date of approval uuless <br />construction has commenced in accordance with the plan. However, if <br />prior to the expiration of the approval, the applicant makes a written <br />request to the [it)' for an extension of time to commence construction <br />setting forth the reason for the requested extension, the Clli:,may grant <br />one extension of not greater than one single year. ;I'be ,CiJ;: shall make <br />a decision on the extension within 30 days of receipt Arty plan may . <br />be revised in the same manner as originally approved. <br /> <br />B. <br /> <br />_b.,AI_plan,"""'" <br />to an appropriac lIaIle, including <br />dimensions and distances and the <br />loam" type, size and description of all <br />propost.d lmdscape maUrWs which win <br />be added to the me ss part oCtile <br />_Iopmmt;, <br />, <br /> <br />, <br /> <br />Dew.d: d <br /> <br />-I <br /> <br />(D'~&I', <br /> <br />DeIetlId: [_ Any other infOlmllf:ion <br />pcrtinc:n. to the particular project which <br />in the opinioo of the applicant is <br />necess.y forthe review of the project'1l <br />, <br /> <br />{..... ""'............'.,,,.,......... ) <br /> <br />~ '=:J <br />DeIeIJed: whim <br />0eIebld: City <br />Deleted: Planning Commission <br />DreIdJed': The Planning Cammi:ssioo <br />may approve. approve with conditions, or <br />deny the stormw&ter pollUion pn:ventioo <br />pl~ <br />DeIebId: City <br />DeIebId: lK its next available meeting <br />DeIeIlecf:City <br /> <br />~'City <br /> <br />~ <br /> <br />- <br />DeIIad: City <br />_:plomtingdoportm"" <br />DeIebed: Receipt of any request roc IQ1 <br />_oballbe_olgodbytho <br />City within 15 days. <br />~~:City <br />