Laserfiche WebLink
<br />Page 1 of 1 <br /> <br />Teresa Bender <br /> <br />From: Paul Palzer [ppalzer@centervillemn.com] <br />Sent: Thursday, March 03, 2005 8:55 AM <br />To; Teresa Bender <br />Subject: CSAH #14 Update <br /> <br />Moming Teresa- <br /> <br />Just an update from the utility meeting yesterday. There was prefirtinary discussion about the staging ofthe <br />roadway and where the utilities would be relocated. Xcel Energy will probably be locating the power poles two <br />feet behind the sidewalk on the north side of Main street. SRF Consulting Group is interested in obtaining the <br />City's streetscape design which would include lighting, trees, plantings, sidewalk design, etc. SRF is now <br />recommending considering utifizing a surcharge method and rubber tire base for the roadway through the park <br />which means Main Street north of Centerville may be closed for up to a year staring the winter of 2006-2007. <br />The possibility of a stop fight at Centerville Road and Main was briefly discussed. Paul <br /> <br />3/3/2005 <br />