Laserfiche WebLink
<br /> TABLE 3 <br /> ASSESSi.\1ENTS FOR WATER\\1AIN INTERCONNECTION <br />West of 20th Avenue Area @$1,835/ac FF @$41.55/FF <br />Clearwater Meadows Outlot Commercial 4.7 8,624.50 690 28,669.50 <br />Lake Area Utilities Commercial 17.6 32,296.00 650 27,007.50 <br />Kenko "A" Commercial 2.9 5,321.50 350 14,542.50 <br />Kenko "B" Commercial 1.7 3,119.50 220 9,141.00 <br />Carpenter Commercial 5.0 9,175.00 320 13,296.00 <br />Reel Manufacturing Commercial 3.6 6,606.00 340 14,127.00 <br /> , <br />Rehbein Inc "A" Commercial 6.6 12,111.00 380 15,789.00 <br />Rehbein Inc "B" Commercial 6.6 12,111.00 100 4,155.00 <br />Rehbein Inc "c" Commercial 1.2 2,202.00 160 6,648.00 <br />East of 20th Avenue <br />Sheehy Industrial 18.1 33,213.50 650 27,007.50 <br />Herman Strelow Industrial 21.1 38,718.50 675 28,046.25 <br />Joyce Stevens Industrial 21.1 38,718.50 675 28,046.25 <br />Gerald Rehbein Industrial 38.4 70,464.00 1350 56,092.50 <br /> <br />Total Properties Assessment <br />Total City's Cost <br /> <br />TOTAL ASSESSMENT <br /> <br />TOTAL PROJECT COST <br /> <br />$272,681.00 <br />$98,300.00 <br /> <br />$272,568.00 <br />$98,300.00 <br /> <br />$370,981.00 <br /> <br />$370,868.00 <br /> <br />$370,575.00 <br /> <br />$370,575.00 <br /> <br />The City's costs were estimated for the cost of oversizing the watermain and the metering vault <br />at the Interconnect to Lino Lakes. <br /> <br />FEAS-260.085 <br /> <br />-7- <br /> <br />260-085-1 ] <br />