Laserfiche WebLink
<br />The charge for commercial, industrial or institutional building shall be: <br /> <br />Two percent (2%) of the total cost oflabor and materials of the heating, <br />Ventilation and air conditioning work to be completed. <br /> <br />Work commenced without fIrst obtaining a permit shall be charged an investigative fee <br />equal to permit fees. <br />