My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-12-28 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2005
>
2005-12-28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 2:37:26 PM
Creation date
1/6/2006 1:49:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Dee 27 2005 12:17 BONESTROO ROSENE ANDERLIJ< 6516361311 p.3 <br /> ~ <br /> .~ <br />, , <br />.. <br />~ Contract Unit Curre.nt Quantlly Amount <br /> NO; Item Unit Quantl1y Prh:e Quantity to Date to Date <br /> BID: <br /> 1 MOBILIZATION LS 1 ~OOO.c;lO' 1 $1,000.00 <br /> 2 CONNECT TO EXISTING "wATER MAIN EA 1 1000.00 1 $1,000.00 <br /> 3 O"PVC,C900 J;F 1700 18.30 1700 $31,110.00 <br /> 4 8" GAte VALVE AND BOX EA 1 700.00 1 $700.00 <br /> 5 S" 45" BEND EA 2 1 OO~OO 2 $200.00 <br /> El S" XS"TEE EA ' 3 140.00 3 $420.00 <br /> 7 HYDRANT AND VALVE EA 3 3220.00 3 $9,660.00 <br /> 8 SALVAGE AND REINSTALL HYDRANT AND <br /> VALVE EA 1 1000.00 1 $1,000.00 <br /> 9 AGGREGATE BASE, CLASS 6 TN 40 12.00 24.!l3 $294.36 <br /> 10 SILT FENCE, REGULAR LF 1600 1.50 1600 $2.400.00 <br /> TOTAL BID: f47,784.36 <br /> CHANGE ORDI;R NO.1, <br /> 1 'INCREAsE; PIPE SIZE TO sa PVC,' C-900 LS 1 5900.00 1 $5,900.00 <br /> 2 INCREASE OF 1% FOR, ' <br /> PAYMENTIP~~FORMANCE BOND LS, 1 539.DO 1 $539.00 <br /> TOTAL CHAN~E ORDER NO.1 ' $6,439.00 <br /> C~GE,OimERN~. 2 <br /> 1 8" PVC, C9~ LF BO 25.00' 80 S2,Ooo.OO <br /> ,2 12" HYDRANT !EXTENSIQN EA 2 3~.OO '2 $700.00 <br /> 3 1S" HYDRANT EXTENSION EA 1 450.00 .1 $450.00 <br /> 4 GATE VALVE STEM EXTEN~ION ~ 4 110.00 4 $440.00 <br /> 5 CREW DOWN TlM.E HR 1.5 600.00 1.5 $900.00 <br /> TOTAL CHANGE ORDER NO.2 $4,490.00 <br /> CHANGE ORDER NO.3, <br /> 1 AbJUSTMEJIolT, FOR FINAL. QUANTITIES LS 1 -185.64 $0.00 <br /> TOTAL CHANGE ORDER NO.3 $0.00 <br /> <br />TOTAL BID: <br />TOTAL CHANGE ORDER NO.1 <br />, , <br />TOTAL CHANGE ORDER NO.2 <br />TOTAL CHANGE ORDER NO.3 <br />TOTAL'WORK COMPLETED TO DATE <br /> <br />$47.784.36 <br />, $6,439.00 <br />$4,490.00 <br />$0.00 <br />$51,713.36 <br /> <br />61806142RE02FJNAL.x1s <br /> <br />~ ~.\~;.. : \~."I.';;Ji"'.i:-~,;;'~> .' <br />W{~' .. <br /> <br /> <br />. ..... <br />
The URL can be used to link to this page
Your browser does not support the video tag.