Laserfiche WebLink
<br /> Contract Unit Current Quantjty Amount <br />No. Item Unit Quantity Price Quantity to Date to Date <br /> ALTERNATE NO.1' FUNDING AGENCV REQUIREMENTS: <br />133 ADDITIONAL COMPENIA.IJON NEEDED IF FUNDING AGENCY <br /> REQUiREMENTI ARE ADDED 10 THE JOB lS 14000 00 01 114,00000 <br /> TOTAL ALTERNATE NO 1 fUND1NG AGENCY REQUIREMENrl 114,00000 <br /> CHANGE ORDER NO, 1 <br />1 CLAIM 1 (WO #3629) IS 82914 182914 <br />2 CLAIM 11)/110 #\3461 1\ 10600 \10600 <br />3 CLAIM 31)/110 #421\) IS 110 65 177061 <br />4 REMOVE CONCRETE CURB AND GUTTER (TYPE III AND IV <br /> STREETS) IF 2000 400 1000 2000 IB, 000 00 <br />I CONCRETE CURB AND GUTTER (llPE IIII\NO IV ITREHS) IF 2000 1400 1000 <br />6 REMOVE CONCRfTf CURB AND GUTTER (TYPE V STREETS) IF 1000 400 1000 1000 14,000 00 <br />7 CONCRETE CURB ANO GUTTER (TYPE V ITREETS) If 1000 1400 10.00 <br />8 CEI\IING ARRI\ REQUIRlMENTS II 1 .300000 (13,000 00) <br />9 HYDROSEEOING IN LIEU Of WOOD fiBER Bll\NKET I~ 910 .038 1000 <br />10 HYDROIEEDlNG IN LIEU OF SOD SY 2300 '0 II ;000 <br />11 CLAIM 11 fwO #3409) II I 227 37 122737 <br /> TOTAL CHANGE ORDER NO 1 \10,93316 <br /> <br />TOMI PARr 1 . PROJECT MANAGEMENT' <br />TOTAl PART 2 . TYPE III & IV IMPROVEMENTI <br />JOTl\l PI\RI 3 .I1Pf V IMPROVEMlNr). CLEAR RIDGE, GRANGE VIEW, BRIAN WAY, BRII\N DRIVE, AND <br />FOX RuN AREAl <br />TOTAL PI\RT 4 . BACKYARD DRAINAGE IMPROVEMENTS - BRIAN DRIVE, )lRD STRfET, AND QUEBEC STRfET <br />AREAl <br />TOTAL AlTfRNATE NO I. fUNDING AGENCY REQUIREMENT\: <br />TOTAL CHANGE ORDER NO I <br />TOTAL WORK COMPlETEO TO OATE <br /> <br />119,60000 <br />\l80.75375 <br /> <br />11\1,\8996 <br /> <br />138,OZ500 <br />114,00000 <br />\10,93316 <br />S6\4.9Gl.87 <br /> <br />f>10091,op.Efj.; .1-;, <br />