My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-26 CC Agenda
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2009
>
2009-08-26 CC Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 2:54:12 PM
Creation date
8/21/2009 2:52:42 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Oly of C81tM1/Ie <br />Peltier ute [)t. AttW street & UtiHty Imp. <br /> <br />Pdge L <br />8/19/09 <br /> <br />Claim #8 (Work Order No. 53501 <br />In summary, the claim is for additional time and materials needed to extend the sewer repair <br />between EXMH 219 and EXMH 220, beyond that of the unit price work associated with the <br />change. This work was directed by City and Bonestroo staff as the conditions in the field <br />dictated. The submitted time and materials appear appropriate and therefore, the claim is <br />approved. <br /> <br />Claim #9 (Work Order Nos. 3410 .. 34121 <br />This claim is for work performed in locating and extending two existing water service stubs such <br />that the ends of the lines extend beyond the new curb line, for future accessibility without <br />damage to the road. This work was done at the direction of City staff and the time and materials <br />claim submitted appears appropriate. Therefore, this claim is approved. <br /> <br />The following is a summary of the Claims addressed herein. <br /> <br />Oaim Number <br />Claim #6 <br />Claim #7 <br />Claim #8 <br />Claim #9 <br />Total <br /> <br />Claim Amount <br />(-$1,500.00) <br />( -$513.00) <br />$3,660.72 <br />$5.178.05 <br />$6,825.77 <br /> <br />Aooroved Amount <br />(-$1,500.00) <br />(-$513.00) <br />$3,660.72 <br />$5.178.05 <br />$6,825.77 <br /> <br />If both parties (contractor and owner) are agreeable to the terms of the Engineer's review of the <br />claims as detailed above, we will draft and process a formal change order to Incorporate this <br />work into the contract. <br /> <br />Sincerely, <br /> <br />BONESTROO <br /> <br />-~4" ~ <br /> <br />Mark Statz, PE <br />City Engineer <br />651-604-4709 <br /> <br />Attachments: Work Order Nos. 5350, 3410, 3412 <br /> <br />cc: Dallas Larson - City Administrator (Owner) <br />Paul Paller - Public Works Director (Owner) <br />Chris Long/Ryan Goodman - 8onestroo <br />file <br />
The URL can be used to link to this page
Your browser does not support the video tag.