<br />Oly of C81tM1/Ie <br />Peltier ute [)t. AttW street & UtiHty Imp. <br /> <br />Pdge L <br />8/19/09 <br /> <br />Claim #8 (Work Order No. 53501 <br />In summary, the claim is for additional time and materials needed to extend the sewer repair <br />between EXMH 219 and EXMH 220, beyond that of the unit price work associated with the <br />change. This work was directed by City and Bonestroo staff as the conditions in the field <br />dictated. The submitted time and materials appear appropriate and therefore, the claim is <br />approved. <br /> <br />Claim #9 (Work Order Nos. 3410 .. 34121 <br />This claim is for work performed in locating and extending two existing water service stubs such <br />that the ends of the lines extend beyond the new curb line, for future accessibility without <br />damage to the road. This work was done at the direction of City staff and the time and materials <br />claim submitted appears appropriate. Therefore, this claim is approved. <br /> <br />The following is a summary of the Claims addressed herein. <br /> <br />Oaim Number <br />Claim #6 <br />Claim #7 <br />Claim #8 <br />Claim #9 <br />Total <br /> <br />Claim Amount <br />(-$1,500.00) <br />( -$513.00) <br />$3,660.72 <br />$5.178.05 <br />$6,825.77 <br /> <br />Aooroved Amount <br />(-$1,500.00) <br />(-$513.00) <br />$3,660.72 <br />$5.178.05 <br />$6,825.77 <br /> <br />If both parties (contractor and owner) are agreeable to the terms of the Engineer's review of the <br />claims as detailed above, we will draft and process a formal change order to Incorporate this <br />work into the contract. <br /> <br />Sincerely, <br /> <br />BONESTROO <br /> <br />-~4" ~ <br /> <br />Mark Statz, PE <br />City Engineer <br />651-604-4709 <br /> <br />Attachments: Work Order Nos. 5350, 3410, 3412 <br /> <br />cc: Dallas Larson - City Administrator (Owner) <br />Paul Paller - Public Works Director (Owner) <br />Chris Long/Ryan Goodman - 8onestroo <br />file <br />