My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-23 CC - Set Agenda w/Handouts
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2009
>
2009-09-23 CC - Set Agenda w/Handouts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2009 3:28:53 PM
Creation date
9/23/2009 3:28:26 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Contract Unit Current Quantity Amount <br />No. Item Unit Quantity Price Quantity to Date to Date <br /> ALTERNATE NO.1 - FUNDING AGENCY REQUIREMENTS: <br />133 ADDITIONAL COMPENSATION NEEDED IF FUNDING AGENCY <br /> REQUIREMENTS ARE ADDED TO THE JOB lS 14000.00 114.000.00 <br /> TOTAL ALTERNATE NO 1 - FUNDING AGENCY REQUIREMENTS 114,00000 <br /> CHANGE ORDER NO.1 <br />1 CLAIM 1 t-NO #3629) LS 1 B2914 1 IB2914 <br />2 CLAIM 2 t-NO #5346) LS 1 106.00 1 110600 <br />3 CLAIM 3 t-No #4215) LS 1 770.65 1 $770.65 <br />4 REMOVE CONCRETE CURB AND GUTTER (TYPE III AND IV STREETS LF 2000 4.00 2000 18.000.00 <br />5 CONCRETE CURB AND GUTTER (TYPE III AND IV STREETS) IF 2000 1400 $0.00 <br />6 REMOVE CONCRETE CURB AND GUTTER (TYPE V STREETS) LF 1000 4.00 1000 $4,00000 <br />7 CONCRETE CURB AND GUTTER (TYPE V STREETS) LF 1000 1400 $0 00 <br />B CEASING ARRA REQUIREMENTS LS 1 -3000.00 1$3,00000) <br />9 HYDROSEEDlNG IN LIEU OF WOOD FIBER BLANKET SY 950 -O.3B $000 <br />10 HYDROSEEDING IN LIEU OF SOD SY 2300 -0.55 $000 <br />11 CLAIM 11 t-No #3409) LS 1 227.3) $227.3) <br /> TOTAL CHANGE ORDER NO.1 $10,93316 <br /> <br />TOTAL PART 1 - PROJECT MANAGEMENT: <br />TOTAL PART 2 - TYPE III & IV IMPROVEMENTS <br />TOTAL PART 3 - TYPE V IMPROVEMENTS - ClEAR RIDGE, GRANGE VIEW, BRIAN WAY, BRIAN DRIVE, AND FOX RUN <br />AREAS: <br />TOTAL PART 4 - BACKYARD DRAINAGE IMPROVEMENTS - BRIAN DRIVE, 73RD STREET. AND QUEBEC STREET AREAS <br />TOTAL ALTERNATE NO.1 - FUNDING AGENCY REQUIREMENTS: <br />TOTAL CHANGE ORDER NO 1 <br />TOTAL WORK COMPLETED TO DATE <br /> <br />$19,60000 <br />$515,78724 <br /> <br />$45,25996 <br />$60,919.00 <br />$14,00000 <br />$10,93316 <br />$666,499.36 <br /> <br />61609170REQ5.x1s <br /> <br />!o1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.