Laserfiche WebLink
<br /> <br />lorlJstlaltlJ <br /> <br />c- ~ ClIII111Jcunl/, Inc. <br /> <br />September 17, 2009 <br /> <br />Bonestroo <br />c/o Mr. Mark Statz, City Engineer <br />2335 Highway 36 W <br />Sl. Paul, MN 55113 <br /> <br /> <br />14777 Lalce Drive <br />F01est Lalce, MN 55025 <br />PH: (651} 464-4500 <br />FAX: (651 }464-4722 <br /> <br />Dear Mark: <br /> <br />Re: Request for Time Extension Due to Swamp Deposits <br /> <br />FLC requests an Extension of Time to the Substantial Completion date due to work associated <br />with the previously unknown swamp deposits that were discovered between approximate street <br />stations 15+50 to 20+50 while installing watermain. <br /> <br />At this stage of the project, installation of watermain was the progress controlling operation. The <br />watermain crew was delayed two (2) days because of lost production to install pipe through the <br />swamp area and to remove bridge debris. The watermain crew was delayed an additional seven <br />(7) days while grading crews excavated the muck and backfilled with woodchips. <br /> <br />We are requesting a 9-day extension due to swamp deposits resulting in a revised Substantial <br />Completion date of October 22, 2009. <br /> <br />Sincerely, <br /> <br />FOREST LAKE CONTRACTING, INC. <br /> <br />/ZLJo.umJ <br /> <br />Robert D. Vollhaber <br />Vice President <br /> <br />Attachments: <br />Peltier Lake Drive Updated #3 Schedule <br />2009 Streets Updated #3 Schedule <br /> <br />AN EQUAL OPPORTUNITY EMPLOYER <br /> <br />61 <br />