Laserfiche WebLink
Contract Unit Current Quantity Amount <br /> No. Item Unit <br /> Quantity Price Quantity to Date to Date <br /> PART 4 - OFF PROJECT - DIRECTIONAL DRILL WATER SERVICES: <br /> 142 CONNECT WATER SERVICE TO EXISTING PLUMBING INSIDE <br /> ' HOME EA 31 400.00 28 29 $11,600.00 <br /> 143 1" WATER SERVICE DIRECTIONAL DRILLED - CURB STOP TO <br /> HOME LF 1550 21.00 1500 1691 $35,511.00 <br /> 144 TOPSOIL BORROW (LV) CY 150 10.00 32 32 $320.00 <br /> 145 SODDING, LAWN TYPE SY 1000 2.65 $0.00 <br /> TOTAL PART 4 - OFF PROJECT - DIRECTIONAL DRILL WATER SERVICES: $47,431.00 <br /> CHANGE ORDER NO. 1 <br /> 1 FUNDING AGENCY CONTRACTING REQUIREMENTS LS 1 8000.00 1 $8,000.00 <br /> TOTAL CHANGE ORDER NO. 1 $8,000.00 <br /> CHANGE ORDER NO. 2 <br /> 1 REMOVE BITUMINOUS PAVEMENT SY 60 3.00 60 60 $180.00 <br /> 2 REMOVE CONCRETE DRIVEWAY PAVEMENT SY 30 4.00 50.00 <br /> 3 ADJUST EXISTING VALVE BOX EA 1 600.00 50.00 <br /> 4 SAWING BITUMINOUS PAVEMENT LF 100 4.00 30 30 $120.00 <br /> 5 SAWING CONCRETE PAVEMENT LF 10 4.00 $0.00 <br /> 6 CONNECT TO EXISTING 8" WATER MAIN EA 2 800.00 2 $1,600.00 <br /> 7 8" PVC C900 WATER MAIN, DR 18 LF 530 52.00 500 $26,000.00 <br /> 8 6" PVC C900 WATER MAIN, DR 18 LF 18 25.00 $0.00 <br /> 9 8" GATE VALVE AND BOX EA 2 1500.00 2 $3,000.00 <br /> 10 DUCTILE IRON FITTINGS LB 240 3.00 396 51,188.00 <br /> 11 1" CORPORATION STOP WITH 8" SADDLE EA 8 300.00 6 6 $1,800.00 <br /> 12 1" CURB STOP AND BOX EA 8 300.00 6 6 $1,800.00 <br /> 13 1" WATER SERVICE - MAIN TO CURB STOP LF 40 14.00 $0.00 <br /> 14 1" WATER SERVICE DIRECTIONAL DRILLED - MAIN TO CURB <br /> STOP LF 270 22.00 250 250 $5,500.00 <br /> 15 IMPROVED PIPE FOUNDATION, PER 6" INCREMENT - WATER <br /> MAIN LF 250 5.00 50.00 <br /> 16 SELECT GRANULAR BORROW (CV) CY 40 14.00 40 40 $560.00 <br /> 17 AGGREGATE BASE, CLASS 5 TN 35 12.00 35 35 $420.00 <br /> 18 TYPE LV4 WEARING COURSE MIXTURE (B) - DRIVEWAYS TN 4.85 110.00 $0.00 <br /> 19 TYPE LV 3 NON- WEARING COURSE MIXTURE (B) TN 10 76.00 $0.00 <br /> 20 TYPE LV 3 WEARING COURSE MIXTURE (B) - 2010 TN 10 77.00 $0.00 <br /> 21 BITUMINOUS MATERIAL FOR TACK COAT - 2010 GAL 5 6.40 $0.00 <br /> 22 6" CONCRETE DRIVEWAY PAVEMENT SY 30 44.00 $0.00 <br /> 23 TOPSOIL BORROW (LV) CY 25 4.00 25 25 $100.00 <br /> 24 SODDING, LAWN TYPE SY 225 2.65 $0.00 <br /> 25 1" CORPORATION STOP WITH 8" SADDLE EA 12 300.00 6 6 $1,800.00 <br /> 26 1" CURB STOP AND BOX EA 12 300.00 6 6 $1,800.00 <br /> 27 1" WATER SERVICE - MAIN TO CURB STOP LF 100 14.00 $0.00 <br /> 28 1" WATER SERVICE DIRECTIONAL DRILLED - MAIN TO CURB <br /> STOP LF 282 22.00 300 300 16,600.00 <br /> 29 TOPSOIL BORROW (LV) CY 25 10.00 25 25 $250.00 <br /> 30 SODDING, LAWN TYPE SY 200 2.65 $0.00 <br /> TOTAL CHANGE ORDER NO. 2 152,718.00 <br /> CHANGE ORDER NO. 3 <br /> 1 MUCK EXCAVATION (EV) CY 3100 15.20 3433 552,181.60 <br /> 2 LIGHTWEIGHT BACKFILL (WOOD CHIPS) (LV) CY 3750 28.00 2813 $78,764.00 <br /> 3 SELECT GRANULAR BORROW (LV) (1 -WAY HAUL) CY 1500 16.60 1644 $27,290.40 <br /> 4 COMMON EXCAVATION (EV) CY 850 -8.00 $0.00 <br /> 5 SELECT GRANULAR BORROW (CV) CY 1150 -14.00 10.00 <br /> 6 4" PERFORATED POLYETHYLENE DRAINTILE PIPE WITH SCOK <br /> WRAP LF 1000 -2.00 50.00 <br /> 7 CREW HOURS HR 17 755.00 17 $12,835.00 <br /> 61609169RE07.bs <br />