My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-06-25
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1997
>
1997-06-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2009 8:13:15 AM
Creation date
12/21/2009 8:12:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> re ;Sr- BSt <br /> Howard R. Green Company rgt,LIMEOM <br /> CONSULTING ENGINEERS <br /> Formerly MSA <br /> Consulting Engineers <br /> June 24, 1997 <br /> File: 260 - 083 -11 <br /> Mr. Jim March, Administrator <br /> City of Centerville <br /> 1880 Main Street <br /> Centerville, MN 55038 <br /> RE: LAKELAND HILLS GRADING PLAN AND PLAT REVIEW <br /> Dear Mr. March: <br /> As you are aware, the Developers of the Lakeland Hills project are seeking approval of the <br /> grading plan at the June 25th Council meeting. We are providing this correspondence at this <br /> time for our recommendation on this issue. We have also provided comments for the <br /> Lakeland Hills Final Plat. We will be continuing to work with the developer to finalize the plat, <br /> Developers agreement and final plans and specifications for approval at the July 9th City <br /> Council meeting. <br /> We recommend approval at this time of the final grading plan for the Lakeland Hills <br /> development. It is important that the Developer begin working on this project to insure that <br /> curb and gutter and streets will be completed in a timely fashion this summer while the <br /> weather is favorable for construction, <br /> Below is a list of comments that remain to be addressed on the final plat. As indicated <br /> above, the final plat will be on the agenda for approval at the July 9th City Council meeting. <br /> Final Plat <br /> • Easements for all wetlands and ponds will need to be shown on the final plat. <br /> • Where utilities will be installed along lot lines, additional easement width will need to <br /> be shown on the final plat. <br /> • Additional drainage easement on Lot 17, Block 3 may be necessary for the storm <br /> sewer pipe entering Pond 5. <br /> • Additional drainage easement is needed for swale between houses on Block 2, Lots <br /> 14 and 15, and Ponds 2 and 3. <br /> • The swale at the rear of Lot 9, Block 3 needs to be covered by a drainage easement <br /> on the plat. <br /> • Additional drainage easement is needed between Lots 7 and 8, Block 2. Runoff from <br /> Lot 8, Block 2 drains across Lot 7, Block 2. <br /> 1326 Energy Park Drive • St. Paul, MN 55108 • 612/644 -4389 fax 612/644-9446 toll free 800/888 -2923 <br /> III, <br />
The URL can be used to link to this page
Your browser does not support the video tag.