My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-06-25
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1997
>
1997-06-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2009 8:13:15 AM
Creation date
12/21/2009 8:12:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 8, 1997 CO <br /> I'OmS[LTISG MINERS Mr. Jim March, Administrator <br /> City of Centerville <br /> 1326 Energy Park Drive 1880 Main Street <br /> Si. Paul, MN 55108 Centerville, MN 55038 <br /> 612. 644.4389 <br /> 1- 8004388 -2923 RE: BID OPENING - 1997 SEAL COAT IMPROVEMENTS <br /> Fax: 612- 644 -9446 <br /> Dear Mr. March: <br /> On May 8, 1997, we opened the bids for the above- referenced project. There were three <br /> plan holders, all of which submitted bids for the project. The apparent low bidder for <br /> the project is ASTEC Corp. Below is a summary of the three bidders and their <br /> corresponding bids for the seal coating work: <br /> ASTEC Corp. $22,036.95 <br /> Allied Blacktop Co. $22,340.00 <br /> Caldwell Asphalt Co., Inc. $26,601.10 <br /> CIVIL ENGINEERING: <br /> E RO ME AL All crack sealing, heat patching, and structural repairs will be done prior to seal coating. <br /> This work is being coordinated with Mr. Paul Palzer from the Centerville Public Works <br /> NNING Department. <br /> SOIJD WASTE <br /> STRUCTURAL We have checked references and find ASTEC Corp. to be a competent contractor for the <br /> SURVEYING project. Once all repairs have been made, we will then recommend award of the contract <br /> TRAFFIC to ASTEC Corp. <br /> TRANSPORTATION <br /> ELECrR,CAUME',.AN,cAL We will be at the Centerville Council Meeting on May 14th to answer any questions the <br /> ENGINEERING. Council may have about the bid. <br /> HVAC <br /> POWER DISTRIBUTION Sincerely, <br /> SCADA <br /> SYSTEM CDNTC :S MSA, CONSULTING ENGINEERS <br /> 4. <br /> David E. Nyberg, P. Paul B. Kauppi <br /> Project Engineer Staff Engineer <br /> DEN /PBK:tw <br /> cc: Mr. Paul Palzer, Centerville Public Works <br /> ICES IN: Mr. Daniel Smith, Allied Blacktop Co. <br /> NEAPOUS Mr. Bruce Batzer, ASTEC Corp. <br /> PRIOR LAKE Ms. Brenda Caldwell, Caldwell Asphalt Co., Inc. <br /> ST. PAUL <br /> 095 - 0810.may <br /> WASECA <br /> An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.