Laserfiche WebLink
• <br /> F. Provide forms and documents needed for normal office use <br /> for 1 of the inspection fees invoiced up to a maximum of <br /> $200.00 per year. <br /> 3. CITY'S OBLIGATIONS <br /> 3.1 General Description. The City shall: <br /> A. Receive and process electrical permits and fees in <br /> accordance with a fee schedule. <br /> B. Forward the white copy of the permits to Contractor, retain <br /> the pink copy of the permit, and file same in <br /> alpha /numerical order by address until the completed white <br /> copy is returned with the report of the completed <br /> inspections and permits. <br /> C. Receive and process orders for payment and fees collected <br /> for fee shortages and extra or special inspections. <br /> D. Adopt an ordinance to provide for an electrical inspection of <br /> all installations requiring inspection within the City. <br /> E. Keep on file with the State Board of Electricity copies of the <br /> current inspection ordinance. <br /> F. Adopt the most recent revision of the Minnesota Electrical <br /> Act including M.S. 326.01. <br /> G. Adopt the Minnesota Rules Chapter 3800. <br /> H. Notify electrical utilities servicing the City that all services <br /> installed, replaced or repaired for which an electrical permit <br /> is required must be approved by the Contractor. <br /> 4. PAYMENT <br /> 4.1 Compensation. The City shall pay to Contractor for the purchased <br /> services 80% of the permit fees collected for permits on the report <br /> for completed inspections. <br /> 4.2 Invoices. Contractor shall, within fifteen (15) working days <br /> following the last day of each calendar month in which the <br /> services were provided, submit an invoice and request for <br /> payment on an invoice form acceptable to the City. <br /> -2- <br />