My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-07-09
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1997
>
1997-07-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2009 9:10:16 AM
Creation date
12/21/2009 9:09:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lakeland Hills CITY COPY <br /> Development Agreement Revised July 7, 1997 <br /> e. Signage and barricades <br /> 1 each @ $200 /each $200 <br /> f. Flushing of storm sewers, once per year until <br /> all lots are built upon $5,000 <br /> g. Street lights <br /> approximately 5 lights @ $500 /light $2,500 <br /> h. E: 2s� � yam os, <br /> i. <br /> 600 square yards per lot @ $2.00 /SY $48,000 <br /> j. City administration for review and compliance of <br /> above 80 hours CO $30 /hour $2.400 <br /> Total Estimated Cost $77,450 <br /> Developer Retainage (110 %) $85,195 <br /> All of the above items under Section 1 with the exception of the trees and sod on <br /> unbuilt lots shall be completed by September 1, 1997. <br /> 2. Also included as items associated with the Private Improvements, the Developer shall <br /> undertake or arrange to accomplish the following: <br /> a. Site Development Issues. <br /> 1) Coordinate with the utility companies to provide for gas main, telephone <br /> lines, cable lines, and power lines to service the properties developed on <br /> the final plat according to the City's joint trench policy. <br /> 2) Provide seeding and vegetation maintenance and control over denuded or <br /> graded areas and mitigation area, at the City's direction. <br /> 3) Provide street name signs and stop signs. <br /> 4) Establish lot corner monumentation within 60 days of grading completion <br /> or by September 1, 1997, after filing the final plat, whichever is sooner. <br /> 5) Provide such street maintenance and control of builder's actions to maintain <br /> roadways clear of mud, soil, and debris to provide safe driving surfaces. <br /> 2601083- 1904.feb Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.