My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-07-09
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1997
>
1997-07-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2009 9:10:16 AM
Creation date
12/21/2009 9:09:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lakeland Hills CITY COPY <br /> Development Agreement Revised July 7, 1997 <br /> guaranteeing the terms and conditions of this contract. The Irrevocable Letter <br /> of Credit shall be renewed or replaced by not later than twenty (20) days prior <br /> to its expiration with a like letter or bond. <br /> g. Reduction of Escrow Guarantee. The Developer may request reduction of the <br /> Letter of Credit or cash deposit based on prepayment or the value of the <br /> completed Private Improvements at the time of the requested reduction. The <br /> amount of reduction will be determined by the City and such recommendation <br /> will be submitted to the City Council for action. <br /> h. Approval of Contractors. Any contractor selected by the Developer to construct <br /> and install any Private Improvements must be determined in writing by the City <br /> Engineer to be acceptable. The City reserves the right to require satisfactory <br /> proof of successful experience and adequate financial status by any such <br /> contractor. <br /> i. Individual Lots. Individual lots will be provided a service for connection to the <br /> drain tile system along the curb and gutter as appropriate according to placement <br /> of the draintile system. The builder must connect sump pump discharge lines or <br /> gravity dram tile lines to this connection. <br /> The Developer shall insure that all homes constructed in the development meet <br /> the architectural and restrictive covenants agreement as approved by the City of <br /> Centerville: <br /> B. STREET AND UTILITY IMPROVEMENTS. In accordance with the policies and <br /> ordinances of the City, the following described improvements (hereinafter collectively called <br /> the "Street and Utility Improvements "), to include improvements as described by the plans, <br /> specifications, and contract documents entitled Lakeland Hills Streets and Utilities, as <br /> prepared by the City Engineer, Howard R. Green Company, and as adopted and approved <br /> by the City Council of the City of Centerville. Said improvements shall be constructed and <br /> installed by the City to serve the Subdivision on the terms and conditions according to <br /> Ordinance #8, Section 38.01, and other improvements specific to the development herein <br /> set forth: <br /> 1. Street Construction. The base course shall be completed before September 1, 1997. <br /> The wear course shall be completed before September 1, 1998, or when the City <br /> deems appropriate according to the progress of work on the individual Lots. The <br /> Developer shall be liable for any increase in cost for construction of the wear course <br /> due to delays in construction on the individual lots. <br /> 2. Construction Procedures. All such improvements set out in Ordinance #8, Section <br /> 38.01, and as additionally specified herein shall be instituted, constructed, and <br /> financed as follows: <br /> 260/083- 1904.feb Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.