My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-07-23
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1997
>
1997-07-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2009 9:17:48 AM
Creation date
12/21/2009 9:17:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Based on the demographics of your community and the growth potential, the <br /> PhonRead System would be a logical approach for several reasons. Firstly, the <br /> system allows for the ability to read your existing TouchRead type meters. <br /> Secondly, you are on the front end of your growth years. The PhonRead <br /> system field hardware is a very simple installation at the time of construction. <br /> Thirdly, the PhonRead MW has no batteries that would need future <br /> replacement. <br /> At anytime should you wish to convert your existing accounts from TouchRead to <br /> PhonRead, our company can provide complete installation services. Since the <br /> meter in the account is already compatible to the PhonRead system, we would <br /> only need to install the MIU and related items. That being the case, the cost per <br /> install would be $30.00 for labor plus any additional costs for hardware. Normal <br /> installation cost for PhonRead including the labor for installing the meter is <br /> $55.00ea. <br /> Thank you again for your consideration of this technology. Looking forward to <br /> hearing from you. <br /> Sincerely, <br /> VA <br /> Ed Wiegert <br /> USF/WaterPro <br />
The URL can be used to link to this page
Your browser does not support the video tag.