My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-01-27
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1999
>
1999-01-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2009 9:53:47 AM
Creation date
12/21/2009 9:53:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> SECTION 1. GENERAL CONDITIONS <br /> 1. In consideration of the covenants and agreements herein set forth, Centerville <br /> shall construct a water system connection to the public water system of Lino Lakes surject to <br /> all terms, conditions, and provisions of this Agreement as hereinafter expressed. <br /> 2. Water flow recording meters shall be installed at the interconnection line For the <br /> purpose of measuring the flow from the Lino Lakes water system into the Centerville water <br /> system and the flow from the Centerville water system into the Lino Lakes water system. <br /> 3. Lino Lakes shall have ownership and be responsible for operation and <br /> maintenance of the water line located within the corporate boundaries of Lino Lakes. <br /> Centerville shall have ownership and be responsible for operation and maintenance of the <br /> interconnection line, metering manhole, and appurtenances of the water lines located within <br /> the corporate boundaries of Centerville. <br /> 4. Centerville shall commence with the design of the metering manhole within 60 <br /> days of the date of agreement. Centerville shall, within nine (9) months from the date of this <br /> agreement, construct and have operational the metering manhole. <br /> 5. The meter shall operate automatically according to an agreed upon telemetry <br /> system to provide each City with water during an emergency condition. <br /> SECTION 2. CHARGES <br /> Each of the meters installed pursuant to this Agreement shall be read at the end of each <br /> calendar quarter. The city with the greatest net flow will bill the other city, by the lOtU of the <br /> month following the end of the calendar quarter, for the amount due based upon such excess <br /> flow. Payments for water usage shall be at the current respective City residential water rate at <br /> the time of billing, including any flat rate that shall be calculated by dividing the total water <br /> 0:yroj269089035•2303.rcb joint uugc Page 2 <br /> Q0fCfl 4 QT•CT QC.L.T h7 -Al.I <br />
The URL can be used to link to this page
Your browser does not support the video tag.