My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-01-27
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1999
>
1999-01-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2009 9:53:47 AM
Creation date
12/21/2009 9:53:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 2 <br /> SANITARY SEWER COSTS <br /> Construction Costs <br /> Restoration 27,500.00 <br /> Trunk Sanitary Sewer including services 161,100.00 <br /> Total Construction Cost $188,600.00 <br /> Overhead Costs <br /> Administration 1.00% 1,886.00 <br /> Engineering 7.50% 14,145.00 <br /> Legal 1.50% 2,829.00 <br /> Construction Administration 2.00% 3,772.00 <br /> Inspection 7.00% 13,202.00 <br /> Staking 2.00% 3,772.00 <br /> Bonding and Finance 4.00% 7,544.00 <br /> Contingencies 10.00% 18,860.00 <br /> Total Overhead Costs 35.00% $66,010.00 <br /> TOTAL PROJECT COSTS $254,610.00 <br /> ASSESSMENTS <br /> Two options to assess the properties adjacent to 20th Avenue are shown in the following tables. <br /> Each table has two columns representing the amount assessed to each property owner. The first <br /> set of costs is based on area in acres for each lot. The second set of costs is based on the front <br /> footage for each lot. Table 3 shows the assessment rates based for the Watermain Interconnection. <br /> Table 4 shows the assessment rates based for the Sanitary Sewer. <br /> FEAS - 260.085 -6- 260- 085 -11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.