Laserfiche WebLink
I <br /> 2. Water flow recording meters shall be installed at the interconnection line <br /> for the purpose of measuring the flow from the Lino Lakes water system into the <br /> Centerville water system and the flow from the Centerville water system into the Lino <br /> Lakes water system. <br /> 3. Lino Lakes shall have ownership and be responsible for operation and <br /> maintenance of the water line located within the corporate boundaries of Lino Lakes. <br /> Centerville shall have ownership and be responsible for operation and maintenance of the <br /> interconnection line, metering manhole, and appurtenances of the water lines located <br /> within the corporate boundaries of Centerville. <br /> 4. Centerville shall commence with the design of the metering manhole within <br /> 60 days of the date of this agreement. Centerville shall, within nine (9) months from the <br /> date of this agreement, construct and have operational the metering manhole. <br /> 5. The meter shall operate automatically according to an agreed upon <br /> telemetry system to provide each City with water during an emergency condition. <br /> 6. The City of Centerville shall complete the construction of a water storage <br /> reservoir within a minimum of eight (8) years from the date of execution of this <br /> Agreement. The City of Lino Lakes may extend the time period for the City of Centerville <br /> to construct the water storage reservoir based on recommendations from the Lino Lakes <br /> Comprehensive Water Plan. <br /> 7. The City of Centerville shall adopt an "odd/even" lawn watering policy. <br /> The City of Centerville shall comply with and enforce total lawn watering bans that may k,L <br /> be implemented by the City of Lino Lakes on Lino Lakes water customers. � I �' h <br /> SECTION 2. CHARGES 1. <br /> Each of the meters installed pursuant to this Agreement shall be read at the end of <br /> each calendar quarter. The city with the greatest net flow will bill the other city, by the A <br /> 10th of the month following the end of the calendar quarter, for the amount due based 47/ <br /> upon such excess flow. Payments for water usage shall be at the current respective City R',1' <br /> residential water rate at the time of billing, (ncluding any flat rate that shall be calculated <br /> by dividing the total water used by the average water consumed per household. Payments <br /> shall be made on or before the 20th day of the month following the end of the uarter, and <br /> shall be administered by current city ordinance. Centerville shall pay for project costs, <br /> including construction costs, pre - engineering, and construction engineering, for the <br /> Centerville meter vault systems. Lino Lakes shall pay for the cost of the Lino Lakes <br /> control systems. <br /> • <br /> 2 <br />