My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-03-10
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1999
>
1999-03-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2009 12:57:22 PM
Creation date
12/21/2009 12:56:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMO <br /> March 4, 1999 <br /> To: Mayor Wilharber and Council <br /> From: Paul Palzer, Public Works Director/Building Official <br /> Re: 1999 Street Work <br /> Dear Mayor and Council: <br /> I have put together a list of the projects for street maintenance this coming road season <br /> and would like consensus on the work and approval to proceed with plans and <br /> specification to bid the project early this spring. <br /> The city is in its third year of the three year contract for crack filling of the streets at a cost <br /> of $.37 per foot. I estimate that the city will fill between 25,000 and 30,000 feet this year <br /> at a total cost of$9,500.00 to $11,000.00. Last year we estimated that there was only <br /> 6000 to 8000 feet to be filled and our contract requires 12,000 feet minimum, so no crack <br /> filling was done. <br /> This year the city should complete an extensive seal coating project since the last project <br /> was performed in 1997. The streets this year include the new streets which have had the <br /> final bituminous lift on for over one year plus the streets that were last seal coated in 1991 <br /> and 1993. I figure that about 72,000 square yards of roadway would be included and <br /> using pea gravel the cost should be about $.45 per yard or $32,500.00 plus engineering <br /> costs. I recommend that the city negotiate a lump sum total cost for engineering to <br /> include the plans and specification, bidding, contract administration and inspection for the <br /> project. <br /> The following is a list of the new streets and those streets Last seal coated in 1991 and <br /> 1993. I have left out a portion of Peltier Lake Drive from Mill Road to Centerville Road <br /> and Center Street from Centerville Road to Pheasant Lane. The reason being is that these <br /> two sections I foresee as being reconstructed with water main and new road surface in the <br /> next two to four years. If this assumption is incorrect these two streets can be added to <br /> the project for $4,500.00. I believe the base of these roadways are in extremely poor <br /> condition and the influence of new development will require looping of water main down <br /> these streets with contributions from the developers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.