Laserfiche WebLink
• <br /> PARTIAL PAYMENT ESTIMATE <br /> NO. 6 <br /> FROM: OCTOBER 22. 1998 , <br /> TO: DECEMBER 1, 1998 <br /> CONTRACTOR: BONINE EXCAVATING, INC. <br /> ADDRESS: 12669 MEADOW VALE ROAD, ELK RIVER, MN 55330 <br /> OWNER: CITY OF CENTERVILLE, MINNESOTA <br /> PROJECT: 26008534 <br /> COMPLETION DATE AMOUNT OF CONTRACT: 5508.19065 <br /> ORIGINAL: AUGUST 1998 ORIGINAL: <br /> REVISED: REVISED: <br /> CONTRACT ITSb1a TBISPERIOR T51TASrTObATE <br /> :< pT$CR3BE7(10 IIN`JT 44.1E IyN(!•. QTV RFI QUNI' Q .yVSO(,�T <br /> RRICB <br /> ,SCHFDIYLE 1 0 SITEWORK <br /> 1 CLEARING AND GRUBBING TREE 20 $50.00 0 50.00 160 58900.00 <br /> 2 CLEARING AND GRUBBING ACRE 1 5400.00 0 5040 0 50.00 <br /> 3 REMOVE WOVEN WIRE FENCE LF 4200 $0.40 0 50.00 2000 5800.00 <br /> 4 SALVAGE AND INSTALL SIGN EA 6 160.00 0 50.00 3 5100.00 <br /> 5 SALVAGE GATE EA I $75.00 0 $0.00 0 5090 <br /> 6 TOPSOIL BORROW CY 2500 51.00 0 $0.00 0 50.00 <br /> 7 SEEDING AC 4 5450.00 0 50.00 7 53,150.00 <br /> 8 MULCHING AC 4 5105.00 0 50.00 • 7 5735.00 <br /> 9 SODDING SY 1500 $1.50 0 50,00 500 575000 <br /> 10 SILT FENCE LF 500 51.25 0 50.00 1400 51.750.00 <br /> T SCHEDULE l.0 SITEWORK -TOTAL 50.00 515,365.00 <br /> SCHFDITLF A 0 STRFFT CONSTRUCTION <br /> I REMOVE CONCRETE CURB AND GUTTER LF 50 $2.00 0 40.00 0 50.00 <br /> 2 SALVAGE AGGREGATE(CV) CY 65 $3.00 0 40.00 0 50.00 <br /> 3 MILL EXISTING BITUMINOUS PAVEMENT SY 35 $1.00 0 50.0o 0 50.00 <br /> 4 SUBGRADE PREPARATION SY 300 50.50 776 $888.00 106 5888.00 <br /> 5 GEOTEXTILE FABRIC SY 300 51.00 0 50.00 0 50.00 <br /> 6 4" PERFORATED THERMOPLASTIC DRAIN PIPE LF 200 55.00 0 5000 0 50.00 <br /> 7 SELECT GRANULAR BORROW (CV) CY 350 $7.50 0 50.00 0 50.0D <br /> 8 AGGREGATE SHOULDERING, CLASS 2 TON 310 $13.75 0 ED(a 0 50.00 <br /> 9 AGGREGATE BASE, CLASS 5 TON 135 511.25 148 51,665.00 148 51.665.00 <br /> 10 BITUMINOUS WEAR COURSE, TYPE 4IA TON 40 570.00 46 53,220.00 46 53,2 <br /> 11 SURMOUNTABLE CONCRETE CURB AND GUTTE LF 50 515.00 0 50.00 0 50.00 <br /> 12 STANDARD PROCTOR EA 1 5700.00 0 50.00 0 50.00 <br /> 13 IN -PLACE DENSITY EA 10 550.00 0 50.00 0 sow) <br /> T SCHEDULE 2.0 STREET CONSTRUCTION -TOTAL 15,773.00 55,773.00 <br /> o: proj \26008516 PAGE 1 <br />