Laserfiche WebLink
APR -08 -88 THU 02:54 PM EDUCATION TECH ALLIANCE FAX N0, 6865501 P.01 <br /> MI.nessa Education rielinaiegy Mesas <br /> AA I <br /> 1300 Mendoto Heights Road • Mendota Heights • Minnesota • 55120.1158 <br /> Minnesota (651) 6866800 • FAX (651) 686.5501 • www.mneto.net <br /> ler <br /> Proposal CTRVLTTGen99 <br /> This document establishes and defines an agreement between the City of Centerville, 1880 Main Street, <br /> MN 55038 -9794 (Customer) and Minnesota Education Technology Alliance, 1300 Mendota Heights ltd., <br /> Mendota Heights, MN 55120 -1158 (MnETA). <br /> Services Provided, <br /> MaETA agrees to provide the labor for the following services: <br /> • install all salver hardware and Install Windows NT Server Operating System and Brame Ex“ Software. S1.120. <br /> • Install 6 client workstations and 113p LaserJet 4000N printer in the same room with the server, establish network <br /> cotntnmticatfou between these peripherals and the NT server, using a local ethernet hub. Standard software to be loaded <br /> on workstations will be limited to Windows operating system software, network communication software and standard <br /> once productivity software ratan Microsoft Office programs. Installation of ethernet cards on existing worlrstadons and <br /> Toshiba laptop upgrades. <br /> 51,034. <br /> • Additional software programs, file transfers from other workstations, amnion atuser logos, etc, relating specifcally to <br /> the above-described system install and agreed to in advance by Customer will be bitted at 570 per hour. <br /> • the setup and installation of the Web Server is not included in the scope of this bid. Y2K compliance for existing <br /> software is not specifically addressed in this proposal. <br /> Staff will be assigned to compime these services in accordance with skills and experience required to compiese the tasks. <br /> bittETA will agree to provide salary, benefits, necessary overhead and training costs for our technology specialists. <br /> Mreement Terms <br /> Agreement Period <br /> Labor and equtptunt pricing for installation win be guaranteed providing acceptance of contract is received before May 1, <br /> 1999, unless the State of Mfaaesots renegotiates its Serofy contract in Ibis agreement period. if a State contract <br /> renegotiations ocean, new equipment pricing would be required. Work nest be =Meted by December 31 ,1999. <br /> Agreement Value. <br /> MnETA shall provide teehhical sappartkonsubing as defined in the <br /> 52134 fixed cost, plus additional harry work as preceding SeotioaS during the agreement period for <br /> reputed by Ctstomer. <br /> Staff Assignment <br /> IefnETA will assign technicians to complete this contract based upon the appropriate skill levels requited. Hours may be <br /> distributed t the agreement period as necessary and mutually agreed to by both parries. <br /> IiInETA staff shall be assigned to work during normal business hems (7 am to 5 pm). or during other bonne mutually <br /> agreed to by the pastes. MnETA reserves the right to make changes in the normal working hours from time to time in <br /> order to accommodate staff or student schedules. MnETA :serves the right to reassign staff to Mbar sites in order to react <br /> to emergency situations daring the agreement period. <br /> • <br /> Ar Equoi Opportunity Enplo tr <br />