My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-04-14
Centerville
>
City Council
>
Agenda Packets
>
1996-2024
>
1999
>
1999-04-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2009 1:17:45 PM
Creation date
12/21/2009 1:16:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. <br /> JnfoTech <br /> 9> 'teckswigy Tarth.eYn <br /> City of Centerville <br /> Quotes good for 30 days N -30 Terms <br /> It is recommended to keep a centralized cable design. This will resolve any future upgrading issues for <br /> your network connectivity, infrastructure and give a cost - effective solution to further issues and outlook. <br /> Infrastructure Wiring <br /> Estimated 800 Ft. 10baseT. Includes Wall Plates, Surface Mounts, <br /> Cats Connectors, Patch Cable 1,400.00 <br /> Patch Panel 24 port, Mounting Bracket. 200.00 1,600.00 <br /> 1 8 Port Hub (Linking workstations) 200.00 <br /> 40 Estimated Labor hours for Installation of wiring, setup <br /> and configuration of workstations, user issues. In accordance <br /> with our block time format for 40 hours. 4.000.00 <br /> Total 5,800.00 <br /> 3761 North Dunlap Street <br /> Arden Hills, Minnesota 55112 <br /> 651 .482.9979 fax 651 .482.9939 <br />
The URL can be used to link to this page
Your browser does not support the video tag.