Laserfiche WebLink
lnfoTech <br /> 9x Zc/txvLv1 giarbters <br /> Peer to Peer <br /> City of Centerville <br /> Quotes good for 30 days N -30 Terms <br /> It is recommended to keep a centralized cable design. This will resolve any future upgrading issues for <br /> your network connectivity, infrastructure and give a cost - effective solution to further issues and outlook. <br /> Infrastructure Wiring <br /> Estimated 800 Ft. 10baseT. Includes Wall Plates, Surface Mounts, <br /> Cat5 Connectors, Patch Cable 1,400.00 <br /> Patch Panel 24 port, Mounting Bracket. 200.00 1,600.00 <br /> 1 8 Port Hub (Linking workstations) 200.00 <br /> 40 Estimated Labor hours for Installation of wiring, setup <br /> and configuration of workstations, user issues. In accordance <br /> with our block time format for 40 hours. 4.000.00 <br /> Total 5,800.00 <br /> 3761 North Dunlap Street <br /> Arden Hills, Minnesota 55112 <br /> 651 .482.9979 fax 651 .482.9939 <br />