My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-04-28
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1999
>
1999-04-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2011 2:27:12 PM
Creation date
12/21/2009 2:01:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t30NESTR00 ROS ENE ANDERLIK S 6516361311 04/22/99 11:50 15 :02/02 N0:818 <br /> &'S., Rpa•M Alt* and An.aoo., bit N in AMY .S. Aaaa.Cpud Op/oft*entpkyr <br /> / �.,� PA ISNI:Oli eaa•ra de 1. <br /> , P.I.1 Jaaaph 0, Andonk, P.E. O Ma. Som.aa. Pt <br /> L7o restroo Adwd I, Tale, P.t 0 don It Cook, 0.1. a Robe O. nmwdl, P.E.I JAM A. iardW& <br /> l e e Rdan W. ROW& P.S. And Swan M. Ebadln. S.P.A., Sams On•WMa <br /> I <br /> Amnia Pea*IW HowW4 A. /MI.00rrgi.1.l KMh A Cord* P.E. a Robin R. PISS* P.I.O <br /> Anderillt & MI aM• VI. <br /> , Pw figar , Pt TS K' Mid P.E a Kamath P. Amnon, P.E a Mark A. Salk P E i <br /> Associates II ltaPaN•. wuIMan <br /> r P,i. Ps„ a.0 E. Kor a a Apra. M. Ring 0 Maa f P. nu P.•. 0 Aka, <br /> Associates Riak <br /> 0*n: M. Paid, RPdana, Maims and St. Cloud, UN 1 Mlh.a *a, WI <br /> Engineers i Architects <br /> WEEK IN REVIEW <br /> ENGINEERING ISSUES <br /> CITY OF CENTERVILLE <br /> April 12 to April 23,1999 <br /> BRA File No. 616 -GEN <br /> )PROJECTS IN CONSTRUCTION <br /> SCHOOL CROSSING AHEAD— FLASHER SYSTEM ON CSAH 14 <br /> • Contractor has met with Anoka County end will finish all work (concrete curb, restoration, and <br /> cleanup) by mid -May. <br /> LAMOTTE PARR <br /> • No new issues to report. <br /> BUECHLER ESTATES <br /> • No new issues to report. <br /> EAGLE PASS <br /> • Houle Contractors are patching streets that have settled. <br /> pRQIIRcn IN DESIGN <br /> WATER INTERCONNECT <br /> • Waiting for Right of Entry from Terminal Transport, Proposed work will cause minor disruption <br /> at the extreme southwest corner of the property. Plans on hold until this is resolved. <br /> APPLE TREE SQUARE <br /> • Grading of site has begun. Pick up permit this week. <br /> DEER PASS <br /> • Reviewed preliminary grading and utility plans. <br /> SEAL COAT <br /> • Three prospective contractors have taken out plans for bidding on Tuesday, April 27, 1999. <br /> GOETZ LANDSCAPING <br /> • Reviewed preliminary drainage plan, spoke to Plowe Engineering about site improvements, <br /> 2998 West Highway 38 0 St. Paul, MN 58113 0 661. 436.4800 0 Fax: 651.636 -1311 <br />
The URL can be used to link to this page
Your browser does not support the video tag.