My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-05-26
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1999
>
1999-05-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2009 3:07:42 PM
Creation date
12/21/2009 3:06:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
bQNtSIKVV KVStNt RNUtKLIK tir 0,10701711 V9 /2T /Y7 II:e, ly :VL/UG NV:000 <br /> Coneetroa ads nt AnOrkk Ara ALGCiWPL M. 11 an MromaPve Arkin/Equal Op.*Malty Employer <br /> B onestroo IfMOp1IIt Ottu a. •OMIrro °, I.E. • Jo,,pn C Andenik, P.F. • Marvel I Sa•vah. P.E. • <br /> oS <br /> �@ 01Erin R. Cook, /d. • R•Ben G. SGIwnlrh, PE. • leery A Bourdon. nE <br /> Rose E <br /> few-, W. Rosen% R0, Mfhhr9 E. !tsMr, PF. pM Siam M MOM. CPA.. Smo• Canna/Ens <br /> 0 Andertik & .490110* PrInelpalt Simnel A. Unfold. PE. • Kenn A Caninn. I. • Roeert R HOMO. /.R • <br /> dehmd W Falter PE, • David 0. GOKkola, Pt • Rawl C Au:wk, 4.14 • Mar• A. Kansan. PC. <br /> In Michael T. RWIMRfft Pl. • Tea Kylela PF, • Semen. P under on, PE. • WO R. Rah. PE. • <br /> Ass ociates Sidney P Williamson. PE. L.S. • RoOal F anomaly • Ayw■ M. Rlnq • Mon k dr <br /> ii Y �r �,idi Meer St Path, RGSMYwr, WINMM and Si Crnud. MN • Milwaukee. WI <br /> Engineers & Architects IGMbnMF• wwwacnhatroo.rod, <br /> May 21, 1999 <br /> Mr. Jim March <br /> City of Centerville <br /> 1880 Main Street <br /> Centerville, MN 55038 <br /> Re: Deer Pass <br /> Preliminary Plat and Grading Plan <br /> Our File No. 616 -99 -104 <br /> Dear Jim: <br /> We have reviewed the revised Preliminary Plat and Preliminary Grading, Drainage, and Erosion <br /> Control Plan. Initial review and comments were submitted to you on April 28, 1999. Please <br /> forward the following comments to the developer for inclusion in the work, <br /> 1. The Implementation Schedule discusses placement of silt fence at locations shown on the <br /> plan, but the plan does not show any silt fence, Prior to grading, silt fence must be in place <br /> around the entire site. Hay bales must be Installed in ditches and other low areas to prevent <br /> erosion. <br /> 2. On Deer Pass Drive. on the inside of the 90 -degree turn, a catch basin is necessary, Grade <br /> the street to maintain crown around the curve, thus eliminating sheeting of water across the <br /> bubble. <br /> Yours very truly, <br /> BONESTROO, ROSENE, ANDERLIK & ASSOCIATES <br /> 1 — w f Jrrl'� <br /> Thomas W. Peterson <br /> TWP /tmr <br /> cc: Paul Palzer. City of Centerville <br /> Gerald Rehbein, R & R Leasing <br /> Dan Schluender, BRAA <br /> 2334 West Highway 36 • St, Paul, MN 55113 • 651.636.9600 • Fax: 651 - 636.1311 <br />
The URL can be used to link to this page
Your browser does not support the video tag.