My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-05-26
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1999
>
1999-05-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2009 3:07:42 PM
Creation date
12/21/2009 3:06:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. March <br /> May 6, 1999 <br /> Page 2 <br /> 1. Prepare the application for a LOMR. This will involve the following <br /> tasks• <br /> ▪ final formatting and calibration of the mottling data <br /> • researching any necessary information requested in the <br /> application <br /> • coordinating the necessary community public notices and state <br /> agency review process <br /> We anticipate our fee for this work will be approximately $1520.00. <br /> 1. Submission of the completed LOMR application, This requires a use <br /> fee ranging from $3,100.00 to $4,700,00, payable ;o FEMA at the time o <br /> submission. The exact amount of the fee depends on the type of recluse; <br /> and the complexity of the request. We were advised by a representative <br /> of FEMA's engineering subcontractor, Dewberry and Davis, that this fee <br /> is likely to be $4,000.00 for this project. This fee is In accord with the fee <br /> schedule published in the Federal Register an January 11, 1999, which <br /> became effective an March 1, 1999. The fee is charged by FEMA ir <br /> order tc cover all costs associated with the review and processing o" <br /> requests for map revisions. <br /> 2. Follow up coordination with FEMA and its engineering <br /> subcontractor, Dewberry and Davis. After receipt of the applicator <br /> materials, an acknowledgement letter will be sent either confirming <br /> receipt of ail necessary materials, or requesting additional item:. <br /> necessary to complete the review. Upon receipt of everything needed. <br /> the agency has 90 days to process and review the application. Our fee <br /> for this work will be on an hourly basis, and Is estimated to be <br /> approximately 5400.00. <br /> It is important to note that these fees are only estimates, and are based solely on a variety of <br /> assumptions regarding the amount of time needed to prepare the required information and <br /> coordinate with FEMA. Delays have been incurred in the past on similar projects, and additional <br /> correspondence has been necessary. <br /> The City of Centerville may be able to realize cost savings on this project waiting to subrnii <br /> this revision with changes proposed by Mr. Gerald Rehbein. RCWD is currently revising the <br /> hydraulic and hydrologic model along the entire stretch of Clearwater Creek upstream of the <br /> City of Centerville. Following completion of their work, Mr. Rehbein may be autherizirg us to <br /> submit a LOMR for portions of Clearwater Creek running through his property. The c: y could <br /> realize cost savings by jointly submitting this LOMR application with Mr. Rehbein, <br /> O:\ PROJ1606170A170- 0506.nryllooJaro R. Green Company <br /> CONSULTING ENGINEERS <br /> 20 2E'd 6b£3 4b9 TS9 'OD N33JE 2iN b9:E9 £ ET- Lt -.AdW <br />
The URL can be used to link to this page
Your browser does not support the video tag.