Laserfiche WebLink
Chair Welk confirmed the proposed lots conform with the R5 zoning, 17,000 square feet <br /> requirements. Ms. Brossard- Vickers suggested the Travis family return with a more defined plan <br /> and she suggested they request to rezone the property from R1 to R5. Mr. March noted the City <br /> will work with the Travis family to develop the developer's agreement, streets, curb, gutters and <br /> utility plans and specifications. <br /> Mr. Buckbee moved to recommend to the Council the property he developed as a R5 zoning <br /> district. . Brossard- Vickers seconded the motion. Motion carried unanimously. <br /> Husnik Homes - Sketch Plan for Property North of Main Street <br /> Mr. Paul Husnik (2640 Westergreen, White Bear Lake) presented a sketch plan for the property <br /> on the north east corner of Main Street and Peterson Trail. The proposed building will consist of <br /> a couple retail units with rear delivery truck access. Mr. Husnik hoped the building will be <br /> constructed and ready for occupancy fall of 1998. <br /> Ms. Broussard- Vickers confirmed the first of two driveways is located 90' from County Road 14. <br /> Mr. March noted the building is proposed to be of brick construction and encroaches 10' within <br /> the drainage easement. Ms. Broussard- Vickers said the building meets with the B1 (commercial) <br /> requirements, however four thousand square feet buildings are identified within the light industrial <br /> zoning district. Therefore, Mr. Husnik may need to redesign the building or request a variance for <br /> the building square footage. <br /> Mr. Nyberg explained the building is proposed to encroach on the drainage easement. However, <br /> there may be room on the east side of the property to create a deep swale so the drainage would <br /> not be hindered. <br /> Greg Watson - Starfir Gymnastics (Vacant pr operty south of Eagle Trucki <br /> Mr. Watson (Senior Project Manager) addressed the Planning Commission and gave an overview <br /> of the proposed building construction and the site plan for a gymnastics facility. The 15,000 sq. <br /> ft. gymnasium is proposed to be located on Clearwater Meadows outlot C. The facility will be <br /> used as a modified day care, dance studio and gymnastic training location. The owners plan to <br /> hold summer camp and Special Olympics at the proposed site. <br /> Mr. Buckbee questioned the project manager as to the height of the building. Mr. Watson said <br /> the height is proposed at 21'. Mr. March noted the ordinance allows a maximum of 35'. <br /> Ms. Brossard - Vickers questioned the engineer about the drainage concept. Mr. Nyberg explained <br /> the drainage from the rear parking lot will drain into the creek. In addition, Mr. Nyberg <br /> suggested extending the berm to buffer the residents from the commercial property. <br /> Ms. Tina Riehle (7044 Cottonwood Court) felt concerned about the drainage because water <br /> collects on the property and then the overflow drains onto her property. <br /> 6 <br />