Laserfiche WebLink
Contract Unit Quantity Amount <br /> No. Item Unit Quantity Price to Date to Date <br /> Schedule 1.0 Grading & Erosion <br /> Control <br /> 1 Mobilization LS 1 $7,000.00 1 $7,000.00 <br /> 2 Common excavation LS 1 $45,000.00 1 $45,000.00 <br /> 3 Muck excavation (EV) CY 1000 $2.00 1000 $2,000.00 <br /> 4 Clear and Grub AC 0.5 $3,800.00 0.5 $1,900.00 <br /> 5 Remove exist. bituminous surface (P) SY 216 $2.00 216 $432.00 <br /> 6 Remove concrete sidewalk (P) SY 19 $4.00 19 $76.00 <br /> 7 Remove existing culverts EA 2 $300.00 2 $600.00 <br /> 8 Remove and salvage existing <br /> aggregate (P) CY 314 $4.85 314 $1,522.90 <br /> 9 Remove and salvage existing lime <br /> aggregate (P) _ CY 184 $2.50 184 $460.00 <br /> 10 Silt fence LF 1200 $1.75 500 $875.00 <br /> 11 Bale checks EA 45 $5.00 20 $100.00 <br /> 12 Timber check dams EA 9 $300.00 $0.00 ___ <br /> 13 Temp. rock construction entrance (P) SY 45 $7.00 45 $315.00 <br /> 14 Riprap (Class 3) CY 8 $65.00 8 $520.00 <br /> Total Schedule 1.0 Grading & Erosion <br /> Control $60,800.90 <br /> Schedule 2.0 Parking Area <br /> Improvements <br /> 15 Modified select granular borrow (P) CY 3530 $9.25 3530 $32,652.50 <br /> 16 Aggregate base, Class 5 TN 1805 $6.00 2022.05 $12,132.30 <br /> 17 Adjust sanitary sewer cleanout covers EA 3 $130.00 $0.00 1 <br /> 18 4 -inch perforated thermoplastic drain <br /> pipe with Type 1 geotextile sock LF 1500 $3.25 1200 $3,900.00 <br /> 19 4 -inch thermoplastic drain pipe LF 750 $3.25 $0.00 <br /> Total Schedule 2.0 Parking Area <br /> Improvements $48,684.80 <br /> Schedule 3.0 Turf Establishment <br /> 20 Seeding (Athletic turf mix) (P) AC 4.3 $2,400.00 4.3 $10,320.00 <br /> 21 Seeding AC 11.6 $1,700.00 11.75 $19,975.00 <br /> 22 Type 5 wood cellulose mulch (Athletic <br /> fields) (P) AC 4.3 $600.00 4.3 $2,580.00 <br /> 23 Mulching AC 11.6 $170.00 11.6 $1,972.00 <br /> 24 Wood fiber blanket SY 2000 $1.30 2000 $2,600.00 <br /> Total Schedule 3.0 Turf Establishment $37,447.00 <br /> Change Order Number 1 <br /> Part A - Storm Sewer <br /> 1 15 inch RCP, Class 4 LF 680 $25.00 680 $17,000.00 <br /> 2 15 inch RCP, F.E.S. Class 4 EA 1 $600.00 1 $600.00 <br /> 3 27 inch diameter CB, incl. 1642 cstg. EA 1 $1,250.00 1 $1,250.00 <br /> 4 2' x 3' box CB 3067V cstg. EA 1 $1,250.00 1 $1,250.00 <br /> 5 Modified select granular borrow (P) CY 975 $11.00 975 $10,725.00 <br /> 6 4 inch pert. thermoplastic drain pipe LF 900 $3.75 900 $3,375.00 <br /> Total Part A - Storm Sewer $34,200.00 <br /> Part B - Hockey Rink <br /> 7 27 inch diameter CB, incl. 4342 cstg. EA 1 $625.00 1 $625.00 <br /> 8 4 foot diameter MH, incl. 4342 cstg. EA 1 $1250.00 1 $1,250.00 <br /> 9 Subgrade excavation (P) CY 1125 $1.60 1125 $1,800.00 <br /> Total Part B - Hockey Rink $3,675.00 <br /> Part C - Electrical <br /> iequest4Final.xls <br />