Laserfiche WebLink
3 tQ $600 each $ 1,800 <br /> e. Silt fence and lot access gravel <br /> 8 Q $500 each $ 4,000 <br /> f. Flushing of storm sewers, once per year until <br /> all lots are built upon $ 1,000 <br /> g. Street lights <br /> approximately 2 ® $500 $ 1,000 <br /> h. Snowplow service of streets <br /> 20 at $100 / plowing $ 2,000 <br /> City administration for review and compliance of $ 2,400 <br /> above - 80 hours at $30 / hour <br /> Total Estimated Cost $13,500 <br /> Developer Retainage (150 %) $20,250 <br /> 2. Also included as items associated with the Private Improvements, the Developer shall <br /> undertake or arrange to accomplish the following: <br /> a. Site Development Issues <br /> 1. Coordinate with the utility companies to provide for gas math, <br /> telephone lines, cable lines, and power lines to service the properties <br /> developed on the final plat according to the City's joint trench policy. <br /> ii. Provide seeding and vegetation maintenance and erosion control over <br /> denuded or graded areas and mitigation area, at the City's direction. <br /> iii. Establish lot corner monumentation within 60 days of grading <br /> completion or within 180 days after filing the final plat, whichever is <br /> sooner. <br /> iv. Provide such street maintenance and control of builder's actions to <br /> maintain roadways clear of mud, soil, and debris to provide safe <br /> driving surfaces. The Developer shall provide street sweeping within <br /> 24 hours of the City's request for such services. <br /> v. Provide for landscaping in accordance with the City ordinances and <br /> other requirements. <br /> The Developer shall accomplish or cause to be accomplished these actions <br /> according to generally accepted trade standards. The Developer will cause to <br /> be furnished to the City a schedule of proposed operations at least five days <br /> prior to commencement of the construction activities. <br /> To the extent possible, the construction vehicles for site grading, streets, and <br /> utilities shall access the site from 20th Avenue. <br /> b. Site Grading, Street Construction and Building Permits. No certificate of <br /> occupancy shall be issued without installation of bituminous base course across <br />