My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-11-10 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1999
>
1999-11-10 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2009 9:51:52 AM
Creation date
12/22/2009 9:51:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J 'to <br /> t cstrno R oselle, Ancfc / _ nd A ssorlat 1 - rs an Aff i[ ve Actson/Equal Opportunity Employer <br /> P opals Ott G. Bonese o. PE Joseph C. Anderlik PE Marvin Sorvala. PE Glenn R. Cook P.E. • Rob t G. Schunich[ PE. Jerry A Bo rd n, PE osene Robert W R sene. PE.. Richard E. Turner. PE. and Susan M. EberlIn. C Senior Consultants <br /> Associate Principals Howard A Sanford, PE. • Keith A. Gordon. P.E.. Robert R. Piefferle, PE • <br /> A nderlik & Richard W Foster, PE • David 0 Loskota, PE • Robert C Russel,. A.LA. • Mark A. Hanson, P.E. • <br /> M T Ra t ann. PE. Ted KField, PE. • Kenneth P Anderson. PE. • Mark R. Rolfs, PE. • <br /> A ssociates S dney P Williamson, PE, LS Robert F Kotsmith - Agnes M Ring • Allan Rick Schmidt. FE. <br /> .7 1. C� �rJ Offices' St Paul. Rochester, Willmar and St Cloud, MN • Milwaukee, WI <br /> Engineers & Architects Webtrze: wwwbonestroo. com <br /> • <br /> October 28, 1999 <br /> Mr. Jim March <br /> City of Centerville <br /> 1880 Main Street <br /> Centerville, MN 55038 <br /> RE: Water Interconnect <br /> Centerville, Minnesota <br /> File No. 616 -98 -809 <br /> Dear Mr. March: <br /> Enclosed, please find four (4) copies of Pay Request No. 1 for the above referenced project. <br /> There are two remaining items to complete the project. The installation of the pressure reducing <br /> valve and the site restoration. Both are anticipated to be complete by 11- 5 -99. We recommend • <br /> payment of $52,390.60 to W.B.Miller Inc. A sum of $2,757.40 (5 %) has been retained until <br /> remaining work has been completed and accepted by both Centerville and Lino Lakes. <br /> • <br /> Please sign all four copies and return the one stamped "engineer's Copy" to our office. Contact <br /> me at (651) 604 -4808 if you have any questions or comments. <br /> Sincerely, <br /> BONESTROO, ROSENE,ANDERLIK & ASSOCIATES <br /> i' <br /> • <br /> Daniel S. Schluender <br /> cc: Enclosure <br /> 2335 West Highway 36 • St. Paul, MN 55113 • 651-636 -4600 • Fax: 651-636-1311 <br />
The URL can be used to link to this page
Your browser does not support the video tag.