My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-11-10 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1999
>
1999-11-10 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2009 9:51:52 AM
Creation date
12/22/2009 9:51:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Contract Unit Quantity Amount <br /> No. Item Unit Quantity Price to Date to Date <br /> • Base Bid - Water Interconnect <br /> 1 12" PVC LF 40 33.5 70.5 $2,361.75 <br /> 2 8" PVC LF 31 27 32 $864.00 <br /> 3 6" PVC LF 5 34.5 23 $793.50 <br /> 4 5" valve hydrant EA 1 2250 1 $2,250.00 <br /> 5 Connect to existing 12 x 12 tee EA 1 805 1 $805.00 <br /> 6 Connect to existing 16" stub EA 1 805 1 $805.00 <br /> 7 12" gate valve and box, in place EA 2 1100 2 $2,200.00 <br /> 8 8" gate valve and box, in place EA 2 650 2 $1,300.00 <br /> 9 6" gate valve and box, in place EA 1 450 1 $450.00 <br /> 10 Fittings LB 2500 0.7 3050 $2,135.00 <br /> 11 Silt fence LF 50 8 50 $400.00 <br /> 12 Sodding, lawn type SY 100 11.5 $0.00 <br /> 13 Seeding with mulch AC 0.1 10350 $0.00 <br /> 14 Pressure reducing and Meter Station LS 1 42325 0.95 $40,208.75 <br /> 15 Improved pipe foundation LF 50 11.5 50 $575.00 <br /> 16 Aggregate base, Class 5 TN 20 25 $0.00 <br /> Total Base Bid - Water Interconnect $55,148.00 <br /> • <br /> Total Base Bid - Water Interconnect $55,148.00 <br /> Total Work Completed To Date $55,148.00 <br /> • <br /> request.ws <br />
The URL can be used to link to this page
Your browser does not support the video tag.