Laserfiche WebLink
. <br /> • Contract Unit Current Quantity Amount <br /> No. Item Unit Quantity Price Quantity to Date to Date <br /> Part 1- Sanitary Sewer <br /> 1 8" PVC, SDR 35 9'- 12' deep LE 330 16 329 329 $5,264.00 <br /> 2 Construct MH over existing pipe EA 1 3500 1 1 $3,500.00 <br /> 3 Standard 4' diam. MH, 8' deep EA 2 1400 2 2 $2,800.00 <br /> 4 MH overdepth LF 11 80 11.52 11.52 $921.60 <br /> 5 8" DIP outside drop LF 7.4 175 5.2 52 $910.00 <br /> 6 8" x 6" PVC wye EA 5 55 5 5 $275.00 <br /> 7 6" PVC service pipe LF 270 15 290 290 $4,350.00 <br /> 8 Improved pipe foundation LF 330 3 330 330 $990.00 <br /> 9 27" x 43" arch CMP (casing pipe for future <br /> MCES forcemain) LF 60 50 60 60 $3,000.00 <br /> Total Part 1 - Sanitary Sewer $22,010.60 <br /> Part 2 - Water Main <br /> 10 8" PVC LF 430 15 440 440 $6,600.00 <br /> 11 6" PVC service pipe LF 270 14 278 278 $3,892.00 <br /> 12 Hydrant with valve EA 2 2050 1 1 $2,050.00 <br /> 13 Connect to existing stub EA 1 1000 1 1 $1,000.00 <br /> 14 8" gate valve and box EA 1 650 1 1 $650.00 <br /> 15 Fittings LB 500 1.25 500 500 $625.00 <br /> 16 Improved pipe foundation LF 300 3 300 300 $900.00 <br /> 17 6" gate valve and box EA 5 550 5 5 $2,750.00 <br /> 18 6" megalugs EA 25 30 3 3 $90.00 <br /> 19 Sod along C.R. 54 SY 200 4.5 0 0 $0.00 <br /> Total Part 2 - Water Main $18,557.00 <br /> Part 3 - Storm Sewer <br /> 20 18" RCP LF 72 25 72 72 $1,800.00 <br /> 21 15" RCP LF 300 23 222 222 $5,106.00 <br /> 22 Catch basin EA 3 1300 3 3 $3,900.00 <br /> 23 18" flared end with trash guard EA 2 700 2 2 $1,400.00 <br /> 24 15" flared end with trash guard EA 3 625 1 1 $625.00 <br /> 25 Rip rap CY 15 65 13 13 $845.00 <br /> Total Part 3 - Storm Sewer $13,676.00 <br /> • <br /> requestl.As <br />