ELECTRICAL PERMIT FEES 1131
<br /> MAXIMUM FEE MINIMUM FEE /
<br /> Single family dwelling or farm building - not over 200 AMP For each inspection or re- inspection the minimum fee is $25.00.
<br /> service is $90.00 (maximum of 3 inspections) 10 ;'''t "A". 6 CO t9
<br /> r 200 and up to 400 AMP service is $130.00 p }rC
<br /> ximum of 4 inspections) $ .50 State Surcharge is added to each permit fee.
<br /> PRORATED FEE FOR INSPECTION OF CERTAIN INSTALLATIONS.
<br /> PAYMENT OF INSPECTION FEES D. Recreational vehicle parks fees shall be in accordance with sections 1 to 3.
<br /> All electrical inspection fees are due and payable to the city/township at or
<br /> before commencement of the installation and shall be filed with a state request E. The fee for mobile home park stalls shall be $25 per unit stall exclusive of
<br /> for electrical inspection form or counter permit form the city /township. Add $ the feeder to the mobile home with a minimum fee of $25 per inspection trip.
<br /> ,50 state surcharge to the total fee calculation. Overpayment of inspection fees The fee for permanently installed feeders shall be in accordance with section 3.
<br /> of less than $10 are not refundable.
<br /> F. In addition to the fees in items A to E, the fee for each street lighting
<br /> ELECTRICAL PERMIT FEE SCHEDULE standard shall be $4 and the fee for each traffic signal standard shall be $5.
<br /> Section 1. Fee for each separate inspection. The minimum fee for each
<br /> separate inspection or reinspection of an installation, replacement, alteration, or G. In addition to the fees in items A to F, the fees for all transformers and
<br /> repair is 525. generators for light, heat, and power shall be 58 per unit plus $4 per ten -
<br /> kilovolt- amperes or fraction thereof. The minimum fee for a transformer or
<br /> Section 2. Fee for services or power supply units. The inspection fee for generator in this category is $25. The maximum fee for a transformer or
<br /> each service, change of service, temporary service, power supply unit, addition, generator in this category is $60.
<br /> alteration, or repair to a service or power supply unit shall be: 0 to an including
<br /> 200- ampere capacity, $25. For each additional 100- ampere capacity or fraction H. In addition to the fees in items A to G, the inspection fee for each trans -
<br /> thereof, $8. A separate request for electrical inspection shall be filed for former for signs and outline lighting shall be $7.
<br /> temporary services. Over 250 volts, the fee Is double.
<br /> I. In addition to the fees in items A to H, unless included in the maximum fee,
<br /> Section 3. Fee for circuits or feeders. The fee for each circuit or feeder, or the inspection fee for remote control, signal, alarm or communication circuits
<br /> addition, alteration, or repair of a circuit or feeder and including circuits fed and circuits of less than 50 volts shall be $8 for ten openings or devices of each
<br /> from feeders, except as provided for in Section 5 A to 1 shall be: a) 0 to an - system plus $4 for each additional ten or fraction thereof, with a minimum fee
<br /> including 30- ampere capacity $6; b) 31 to and including 100- ampere capacity, of $25 per inspection trip.
<br /> 58; and c) for each additional 100- ampere capacity or fraction thereof, $4.
<br /> Over 250 volts, the fee is double. J. In addition to the fees in items A to I, the inspection fee for each separate
<br /> inspection of a swimming pool shall be 525. Reinforcing steel and bonding for
<br /> S 4. Fee for energy efficiency and ballast retrofitting. The inspection swimming pools requires a rough -in inspection.
<br /> fee tor replacement of ballasts, lamps, installation of kits or other energy
<br /> efficient equipment is $ .25 per ballast for up to 100 ballasts. The fee for Section 6. Fees for work begun without a permit.
<br /> additional ballasts is $ .15 per ballast. For installations of over 100 ballasts, an A. Whenever any work for which an electrical permit is required has begun with -
<br /> initial and concluding inspection are required while work is in progress. The out first filing the permit, a double fee will be assessed. The double fee is calcu-
<br /> minimum fee per inspection is 525, Iated from all applicable sections 1 to 5.
<br /> Section 5. Limitations and additions to the fees of Sections 1 to 3. B. The payment of the double fee does not exempt any person from compliance
<br /> A. The fee for a single - family dwelling, shall not exceed 590 if the electrical with all other provisions of the state rules or statutes nor from any penalty pre -
<br /> service is not over 200 - ampere capacity. This fee includes not more than three scribed by law.
<br /> inspections. The fee for a single family dwelling over 200 to and including
<br /> 400- ampere capacity shall not exceed $130. This fee includes not more than Section 7. Special Inspections. For inspections not covered in this part, or for
<br /> four inspections. These fees shall apply to each separate service, and include requested special inspections or services, the fee shall be $34 per hour, including
<br /> the service, feeders, circuits, fixtures, and equipment. The fee for additional travel time, plus .30 cents per mile traveled, plus the reasonable cost of equipment
<br /> inspections or reinspections is $25, Multifamily dwellings with individual or material consumed. This provision is applicable to inspection of empty con -
<br /> services to each unit are computed at the single family dwelling rate. duits and other jobs as may be determined by the enforcement authority.
<br /> B. The fee for each farm building or farm structure with a service not over 200- Section 8. Inspection of transient projects. For inspection of transient projects,
<br /> ampere capacity shall not exceed $90. This fee includes not more than three including but not limited to carnivals and circuses, the inspection fees shall be as
<br /> inspections. The fee for each building or structure with a service over 200 to specified in this section.
<br /> and including 400- ampere capacity shall not exceed 5130. This fee includes not
<br /> more than four inspections. These fees include the services, feeders, circuits, The fee for inspection of power supply units shall be that fee specified in section
<br /> fixtures, and equipment. The fee for additional inspections or reinspections is 2. A like fee will be required for power supply units at each engagement during
<br /> 525. Pole -top current metering and pole -top disconnecting means on the farm the season.
<br /> yard pole are exempt from inspection and inspection fees. Over 250 volts, the
<br /> fee is double. Rides, devices, or concessions shall be inspected at their first appearance of the
<br /> s tWC • season, and the inspection fee shall be 525 per unit.
<br /> C. The fee for each unit or a multifamily dwelling having three to six dwelling
<br /> units shall not exceed 550. The fee for additional dwelling units of a multifam- In addition to the fee for the power supply units, there shall be a general inspec-
<br /> il (ling exceeding six units shall not exceed 540 per dwelling unit. This tion for each engagement during the season at the hourly rate of 534 with a two -
<br /> fc udes only the wiring in an individual dwelling unit and the final feeder hour minimum. In addition to the above fees, inspections required on Saturdays,
<br /> to that unit. The fee for the service and all other circuits shall be as specified Sundays, holidays, or after regular business hours will be at the hourly rate, in-
<br /> in sections 1 to 3 except that the fee for each house panel shall not exceed 590. eluding travel time. Also, a fee at the hourly rate will be charged for additional
<br /> A separate permit is required for each building. The fee for a two -unit dwelling time spent by the inspector if the equipment is not ready for inspections at the
<br /> or duplex shall be the same as for two single - family dwellings. time and date specified on the permit. The fee for reinspection of corrections is
<br /> $25 for each reinspection.
<br />
|