Laserfiche WebLink
Contract Unit Quantity Amount <br /> No. Item Unit Quantity Price to Date to Date <br /> Part 1 - Sanitary Sewer - Centerville Road <br /> 1 Mobilization LS 1 13500.00 0.5 $6,750.00 <br /> 2 Traffic control LS 1 2912.00 0.3 $873.60 <br /> 3 Shouldering aggregate TN 50 24.45 50.00 <br /> 4 Clear and Grub Tree 2 500.00 2 51,000.00 <br /> I 5 Silt fence, regular LF 200 2.00 50.00 <br /> 6 Remove and replace 36" CMP LS 1 1500.00 1 $1,500.00 <br /> 7 Salvage and replace gravel driveway , TN 20 17.07 50.00 <br /> to existing manhole EA 1 1500.00 1 51,500.00 <br /> 8 Connect PVC, 9 <br /> 9 12" PVC, SDR 35, 8 10' deep LF 250 28.09 250 $7,022.50 <br /> 10 12" PVC, SDR 35, 10 12' deep IF 175 28.09 175 $4,915.75 <br /> 11 12" PVC, SDR 35, 12'- 14' deep LF 10 28.09 10 5280.90 <br /> 12 12" PVC, SDR 35, 14' -16' deep LF 265 28.09 265 $7,443.85 <br /> 13 12" PVC, SDR 26, 16'- 18' deep LF 5 30.54 5 $152.70 <br /> 14 12" PVC, SDR 26, 18' - 20' deep LF • 15 30.54 15 $458.10 <br /> 15 4' dia. sanitary manhole EA 1 1394.73 1 $1,394.73 <br /> 16 Manhole overdepth LF 3 99.97 3 $299.91 <br /> 17 Adjust MH frame and ring casting EA 1 150.00 50.00 <br /> 18 Remove bituminous street SY 330 2.00 250 5500.00 <br /> 19 Patch bituminous street SY 330 15.92 50.00 <br /> 20 Salvage and reinstall 12" CMP culvert LF 40 16.67 40 $666.80 <br /> 21 Improved pipe foundation LF 720 0.01 50.00 <br /> 22 Fiber blanket on steep slopes SY 600 2.08 $0.00 <br /> 23 Seeding with topsoil and mulch AC 0.75 998.40 $0.00 . <br /> Total Part 1 - Sanitary Sewer - Centerville Road $34,758.84 <br /> Part 2 - Water Main - Centerville Road <br /> 24 Connect to existing 12" water main EA 1 750.00 1 $750.00 <br /> 25 12" PVC, C900 LF 1062 23.86 1062 $25,339.32 <br /> 26 8" PVC, C900 LF 35 16.71 35 5584.85 <br /> 27 6" PVC, C900 LF 50 14.24 50 5712.00 <br /> 28 8" gate valve and box EA 1 652.74 1 5652.74 . <br /> 29 12" butterfly valve and box EA 3 851.33 3 $2,553.99 <br /> 30 Hydrant with gate valve and box EA 3 , 1899.17 3 55,697.51 <br /> 31 Valve rod extension EA 7 143.49 $0.00 1 <br /> 32 Fittings LB 3000 1.15 2000 $2,300.00 <br /> 33 Improved pipe foundation LF 1100 0.01 50.00 <br /> 34 Sodding SY 700 2.55 50.00 <br /> 35 12" pipe restraint EA 20 69.64 20 $1,392.80 <br /> 36 8" pipe restraint EA 4 39.85 4 $159.40 <br /> 37 Seeding with topsoil and mulch AC 0.25 1018.64 50.00 <br /> Total Part 2 - Water Main - Centerville Road 540,142.61 <br /> Part 3 - Services - Centerville Road <br /> 38 12" x 6" PVC wye EA 2 236.27 2 5472.54 <br /> 39 12" x 4" PVC wye EA 2 229.88 2 $459.76 <br /> 40 4" PVC, Schedule 40 service pipe LF 40 11.22 $0.00 <br /> 41 6" HDPE sewer service directional drill LF 156 42.02 50.00 <br /> 42 4" PVC, Schedule 40 riser pipe LF 10 17.47 10 5174.70 <br /> 43 1" copper water service LF 90 8.59 50.00 <br /> 44 1" copper service directional drill LF 400 9.39 50.00 <br /> 45 Reconnect water service EA 1 178.76 $0.00 <br /> 46 Connect to existing sewer service EA 1 178.76 50.00 <br /> 47 1" curb stop and box EA 6 132.51 50.00 <br /> 48 1" corporation stop EA 7 143.16 50.00 <br /> Total Part 3 - Services - Centerville Road $1,107.00 <br /> Part 4 - Sanitary Sewer - Hunters Crossing <br /> 49 8" PVC, SDR 35, 18'- 20' deep - jacked LF 60 246.99 60 $14,819.40 <br /> 50 8" PVC, SDR 35, 8'- 10' deep LF 350 16.25 350 $5,687.50 <br /> 51 8" PVC, SDR 35, 10'- 12' deep LF 900 18.37 900 $16,533.00 <br /> 52 8" PVC, SDR 35, 12'- 14' deep LF 300 18.37 300 55,511.00 <br /> 53 8" PVC, SDR 35, 14'- 16' deep LF 500 20.14 493 59,929.02 <br /> 54 4' diameter sanitary manhole EA 9 1362,87 10 $13,628.70 <br /> 55 Manhole overdepth LF 56 99.97 50 $4,998.50 <br /> Request as <br />