Laserfiche WebLink
1 <br /> MEMO <br /> DATE : September 8, 2000 <br /> TO : Honorable Mayor and Council <br /> FROM: Jim March <br /> RE : Storm Sewer Realignment - Lloyd Drilling (1873 Main Street) <br /> As you may recall, Council previously discussed a request from Lloyd Drilling for <br /> permission to realign storm sewer that exists at the property across the street from City <br /> Hall. The current storm sewer runs between the existing vacant commercial lot and the <br /> existing home at 1873 Main Street. <br /> At a previous meeting, Council chose not to grant this request until it was determined <br /> whether or not a Rice Creek Watershed Permit would be required for this site. Included <br /> in your packet is a memo from the RCWD stating that a permit would not be required for <br /> the development of this site. The only reason a pent was required for the stripmall on <br /> the west side of Peterson Trail is because a small area of wetland previously existed on <br /> that site. <br /> I would recommend that this request be approved. City Engineer Tom Peterson has <br /> previously reviewed this proposed realignment. <br />