Laserfiche WebLink
Contract Unit Quantity Amount <br /> o. Item Unit Quantity Price to Date to Date <br /> Part 1 - Site Work <br /> 1 Remove existing fence LS 1 $500.00 1 $500.00 <br /> 2 Remove bituminous pavement SY 40 53.00 40 5120.00 <br /> 3 Sawing Bituminous Pavement LF 30 $3.00 50.00 <br /> 4 Aggregate base TN 10 $25.00 207.8 $5,195.00 <br /> 5 Bituminous base course, Type 31 B TN 5 $80.00 $0.00 <br /> 6 Bituminous wear course, Type 41B TN 5 590.00 50.00 <br /> 7 Granular borrow TN 36 $16.00 64.92 51,038.72 <br /> 8 Topsoil borrow (LV) CY 50 $14.00 50.00 <br /> 9 4" concrete sidewaik SF 110 $7.00 100 5700.00 <br /> 10 Sodding, .awn type SY 150 55.00 $0.00 <br /> 11 Silt fence, regular LF 50 54.00 50 $200.00 <br /> 12 Selective demolition, remove ex. pumps, <br /> valves and controls LS 1 52,500.00 1 $2,500.00 <br /> 13 72" diameter x 48" sanitary manholes addition EA 1 $2,000.00 1 $2,000.00 <br /> Total Part 1 - Site Work: $12,253.72 <br /> Part 2 • Lift Station Valve Vault and <br /> Controls - Option "A" <br /> 14 Valve vault and valves LS 1 $8,000.00 1.075 $8,600.00 <br /> 15 Buried fittings LB 350 $4.00 350 $1,400.00 <br /> 16 4" DIP forcemain LF 20 $110.00 20 $2,200.00 <br /> 17 Connect to existing force main LS 1 $2,600.00 1 52,600.00 I <br /> 18 Connect to existing wet well LS 1 52,700.00 1 $2,700.00 <br /> 19 Submersible pumps, base bend, guide rails, <br /> and accessories with by -pass pumping LS 1 $18,290.00 1 518,290.00 <br /> 20 Lift station top slab with hatch LS 1 $3,400.00 1 $3,400.00 <br /> 21 Lift station controls - Option "A" LS 1 520,800.00 0.2 $4,160.00 <br /> Total Part 2 - Lift Station Valve Vault and <br /> Controls - Option "A ": 543,350.00 <br /> Change Order No. 1 <br /> t Connect to existing valve vault LS 1 3700 1 33,700.00 <br /> 2 Install 6" HDPE forcemain (directional bore - LF 254 63 316,002.00 <br /> Peltier Lake Drive) 254 <br /> 3 Install 6" HDPE forcemain (directional bore - LF 500 63 331,500.00 <br /> Mill Road) 500 <br /> 4 Fuse 6" pipes at intersection EA 1 2500 1 32,500.00 <br /> 5 Connect to existing manhole EA 1 1500 1 $1,500.00 <br /> 6 Type 31 bituminous base course TN 25 60 30.00 <br /> 7 Bituminous wear course, Type 41 TN 25 70 30.00 <br /> 3 Sodding, lawn type SY 50 6 30.00 . <br /> Total Change Order No. 1 $55,202.00 <br /> Total Part 1 - Site Work: $12,253.72 <br /> Total Part 2 - Lift Station Valve Vault and <br /> Controls - Option "A ": $43,350.00 <br /> Total Change Order No. 1 $55,202.00 <br /> Total Work Completed To Date $110,805.72 <br /> request 2 <br />