If the total system replacement alternative is chosen, then use of microwave point -to -point radio <br /> for communications links to remote radio sites can be cost justified. In addition, microwave <br /> circuits will provide better reliability, stability and audio clarity. It is recommended that <br /> microwave point -to -point links be used if the total system replacement alternative is chosen. <br /> Regardless of the alternative chosen, it is important that a back -up location for receiving 9 -1 -1 <br /> telephone calls from the public and from which minimum control of the radio network will be <br /> possible should be implemented at the earliest possible time. Planning for a back -up dispatch <br /> center is complete and funding has been made available in the Anoka County budget. <br /> There is substantial congestion for eight hours each day on the single law enforcement channel in <br /> use. The second law enforcement dispatch channel should be made operational for 24 hours per <br /> day compared to the current 16 hours per day in order to provide some relief from congestion for <br /> law enforcement personnel. Use of the second channel during an additional eight hours per day <br /> will result in some improved radio coverage during the eight hour period in the northern areas of <br /> the county. This change should be implemented as quickly as it is possible to hire and train <br /> additional law enforcement dispatch radio operators. <br /> The improvements to the fire radio page alerting are a critical need that can be implemented as <br /> quickly as additional equipment can be placed into service since no additional radio frequencies <br /> are required. This upgrade of fire service radio paging will need to be done regardless of which <br /> base system direction alternative is chosen. Therefore, the fire radio page alerting system should <br /> be implemented as quickly as possible. <br /> In teens of the direction that is selected for implementation, the report lists in Section 4.4.4 a <br /> series of steps that need to be taken. The first of those steps is to decide which of the two base <br /> alternative directions is to be followed. Within the base altemative chosen, there are additional <br /> subalternatives that also need to be decided upon. Once the direction is established, the required <br /> amount of funding will be known and must be arranged. Additional radio frequencies will be <br /> needed if the enhancement of existing systems alternative is chosen. Needed radio sites will <br /> need to be identified based on engineering studies and agreements will have to be executed for <br /> use of those sites. Communications engineering work would then need to be performed followed <br /> by a procurement phase and implementation phase. <br /> Because of the critical nature of many of the system deficiencies identified, it is essential that <br /> public officials in Anoka County proceed as quickly as possible to decide on the long -term <br /> direction to be followed and the other steps to get the necessary upgrades implemented. <br /> Ronald Vegenosl Engineering, Inc. -3- Report Anoka County <br />