Laserfiche WebLink
430NESTROO ROSENE ANDERLIK3 W 6516361311 11/01/00 10:24 5:05/05 N0:063 <br /> Contract Unit Quantity Amount <br /> No. Item Unit Quantity Price to Data to Data <br /> Pan 1 - Site work <br /> ; Remove ex.sang fence LS 1 5500.00 1 5600.00 <br /> 2 Remove bituminous pavement SY 40 5300 40 5120.00 <br /> 3 Sawing Bturr,nous Pavement LF 30 $3.00 $0.00 • <br /> • <br /> 4 Aggregate base TN 10 52500 50.00 <br /> 5 Bituminous base course, Type 319 TN 3 580.00 $0.00 <br /> 8 Bituminous wear courS., Type 418 TN 5 500.017 50.00 <br /> 7 Granular borrow TN 39 516.00 50.00 <br /> 8 Topsoil oorraw fLW CY 50 $14.00 50.00 <br /> 9 4" concrete stiewalk SP 110 57.00 $0.00 <br /> 10 Sodding, lawn type <br /> 5Y 190 35.00 $0.00 <br /> • <br /> 11 Silt fence, regular LP 50 $4.00 50 5200.00 <br /> 12 Se;EIS demolition, remove ex. pumps, 1 $2.500.00 <br /> valves and controls LS 1 $2,800.00 <br /> 13 addition . PEA 1 52,000.00 • 1 52,00050 , . <br /> Total Part 1 • site Work 58,320.00 <br /> Put 2 • Litt station Valve Vault and <br /> Controls • Option "A" <br /> 14 Valve vault and valves Le 1 59,000.00 1 58,000.00 <br /> 15 Burled l hings LB 350 5400 350 11.400,00 <br /> 16 a^ DIP forcemain LF 20 Si 1000 20 52,200.00 . <br /> 17 Connect to existing force main LS 1 52500.00 1 32000.00 <br /> ' 18 Connect to existing wit well l8 1 52,700.00 1 52,700.00 <br /> • 19 Subnersiblo pumps, base bend, guide tails, 1 518.2 &0.00 <br /> and accessories wnn by - pass pumps p l3 1 518,290.00 <br /> 20 Lift station to slab with hatch LS 1 53,400.0 1 51400.00 c <br /> 21 Lift station controls - Option 'A• 15 1 520.900.00 50.00 <br /> Total Pan 2 . Lift Station Valve Vauh and <br /> COMMIS • OpttbnR: 536,590.00 <br /> Total Pan 1 • Site Work: 56.320.00 • <br /> Total Part 2 - Lift Station Valve Vault and . <br /> Controls - Option 'A': 535,590.00 <br /> Total Work Completed To 0eta 543'510.X0 <br /> • <br /> ` ;II <br /> 1l <br /> i' • <br /> ii <br /> i . <br /> • <br /> j : <br />