My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-01-12 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2000
>
2000-01-12 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2009 8:35:11 AM
Creation date
12/23/2009 8:34:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1997 UNIFORM BUILDING CODE, VOLUME 1 <br /> a <br /> TABLE A- 33- A- GRADING PLAN REVIEW FEES <br /> 50 cubic yards (382 m or less No fee <br /> 51 to 100 cubic yards (40 m to 76.5 m 523.50 <br /> I 101 to 1,000 cubic yards (772 m to 764.6 m 37.00 <br /> 1,001 to 10,000 cubic yards (765.3 m to 7645.5 m <br /> 49.25 <br /> 10,001 to 100,000 cubic yards (7646.3 m to 76 455 m $49.25 for the first 10,000 cubic yards (7645.5 m plus 524.50 for <br /> each additional 10,000 yards (7645.5 m or fraction thereof. <br /> I 100,001 to 200,000 cubic yards (76 456 m to 152 911 m for the first 100,000 cubic yards (76 455 m plus 513.25 <br /> for each additional 10,000 cubic yards (7645.5 m or fraction thereof. <br /> 200,001 cubic yards (152 912 m or more-5402.25 for the first 200,000 cubic yards (152 911 m plus 57.25 for each addi- <br /> tional 10,000 cubic yards (7645.5 m or fraction thereof. <br /> Other Fees: <br /> Additional plan review required by changes, additions or revisions to approved plans $50.50 per hour' <br /> (minimum charge -one -half hour) <br /> 'Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment. <br /> hourly wages and fringe benefits of the employees involved. <br /> TABLE A 33 B-- GRADING PERMIT FEES <br /> 50 cubic yards (38.2 m or less 523.50 <br /> 51 to 100 cubic yards (40 m to 76.5 m 37.00 <br /> 101 to 1,000 cubic yards (77.2 m to 764.6 m $37.00 for the first 100 cubic yards (76.5 m plus 517.50 for each additional <br /> 100 cubic yards (76.5 m or fraction thereof. <br /> • 1,001 to 10,000 cubic yards (765.3 m to 7645.5 m )-5194.50 for the first 1,000 cubic yards (764.6 m plus 514.50 for each <br /> additional 1,000 cubic yards (764.6 m or fraction thereof. <br /> I 10,001 to 100,000 cubic yards (7646.3 m to 76 455 m $325.00 for the first 10,000 cubic yards (7645.5 m plus 566.00 for <br /> each additional 10,000 cubic yards (7645.5 m or fraction thereof. <br /> 100.001 cubic yards (76 456 m or more -$919.00 for the first 100,000cubic yards (76 455 m plus 536.50 for each addition- <br /> al 10,000 cubic yards (7645.5 m or fraction thereof. <br /> Other Inspections and Fees: <br /> 1. Inspections outside of normal business <br /> hours 550.50 per hour' <br /> (minimum charge -two hours) <br /> 2. Reinspection fees assessed under provisions of <br /> Section 108.8 550.50 per hour' <br /> 3. Inspections for which no fee is specifically <br /> indicated 550.50 per hour= <br /> <mmimum charge -one -half hour) <br /> 1 T fet* a grading permit authorizing additional work to that under a valid permit shall be the difference between the fee paid <br /> for the original permit and the fee shown for the entire project. <br /> 2 0r the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment. <br /> hourly wages and fringe benefits of the employees involved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.