Laserfiche WebLink
EXHIBIT B CONTINUATION <br /> GRADING PERMIT FEES* <br /> 50 cubic yards (38.2 m3) or less $23.50 <br /> 51 to 100 cubic yards (40 m3 to 76.5 m3) $37.00 <br /> 101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) - $37.00 for the first 100 cubic yards <br /> (76.5 m3) plus $17.50 for each additional 100 cubic yards (76.5 m3) or fraction <br /> thereof. <br /> 1,001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3) - $194.50 for the first 1,000 <br /> cubic yards (764.6 m3), plus $14.50 for each additional 1,000 cubic yards <br /> (764.6 m3) or fraction thereof. <br /> 10,001 to 100,000 cubic yards (7646.3 m3 to 7645.5 m3) - $32500 for the first 10,000 <br /> cubic yards (7645.5 m3), plus $66.00 for each additional 10,000 cubic yards <br /> (7645.5 m3) or fraction thereof. <br /> 100,001 cubic yards (7645.6 m3) or more - $919.00 for the first 100,000 cubic yards <br /> (7645.5 m3), plus $36.50 for each additional 10,000 cubic yards (7645.5 m3) <br /> or fraction thereof. <br /> Other Inspections and Fees: <br /> 1. Inspections outside of normal business hours $50.50 per hour <br /> (minimum charge - two hours) <br /> 2. Reinspection fees assessed under provisions of <br /> Section 108.8 $50.50 per hour <br /> 3. Inspections for which no fee is specifically indicated $50.50 per hour <br /> (minimum charge - one -half hour) <br /> * The fee for a grading permit authorizing additional work to that under a valid permit <br /> shall be the difference between the fee paid for the original permit and the fee shown for <br /> the entire project. <br /> ** Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall <br /> include supervision, overhead, equipment, hourly wages and fringe benefits of the <br /> employees involved. <br />