My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-04-12 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2000
>
2000-04-12 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2009 9:09:46 AM
Creation date
12/23/2009 9:09:19 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIT <br /> ITEM UNIT PRICE QUANTITY TOTAL <br /> PART B - WATER MAIN - CENTERVILLE ROAD <br /> CONNECT TO EX. WATER MAIN EA $ 650.00 1 $650.00 <br /> 12" PVC WATER MAIN LF $ 25.00 1440 36,000.00 <br /> 6" PVC WATER MAIN LF $ 16.00 30 480.00 <br /> 12" PVC - JACKED LF $ 150.00 60 9,000.00 <br /> 12" BV & BOX EA $ 900.00 3 2,700.00 <br /> HYDRANT WNALVE EA $ 1,800.00 3 5,400.00 <br /> FITTINGS LBS. $ 1.50 2940 4,410.00 <br /> IMPROVED PIPE FOUNDATION LF $ 2.00 1400 2,800.00 <br /> SODDING SY $ 3.00 670 2,010.00 <br /> REMOVE BITUMINOUS STREET SY $ 8.00 50 400.00 <br /> PATCH BITUMINOUS STREET SY $ 20.00 50 1,000.00 <br /> 12" PIPE RESTRAINT EA $ 50.00 20 1,000.00 <br /> SALVAGE & REPLACE GRAVEL DRIVEWAY TN $ 15.00 20 300.00 <br /> SEEDING W/TOPSOIL AND MULCH AC $ 1,300.00 0.7 910.00 <br /> SUBTOTAL $67,060.00 <br /> 5% CONTINGENCY $3,353.00 - <br /> TOTAL CONSTRUCTION COST $70,413.00 <br /> 30% INDIRECT COSTS $21,124.00 <br /> TOTAL COST - WATER MAIN - CENTERVILLE ROAD $91,537.00 <br /> PART C - SERVICES- CENTERVILLE ROAD <br /> 12" X 4" PVC WYE EA $ 150.00 5 $750.00 <br /> 4" PVC SEWER SERVICE LF $ 9.00 65 585.00 <br /> 4" HDPE SEWER SERVICE DIRECTIONAL DRILL LF $ 30.00 150 4,500.00 <br /> 4" PVC RISER PIPE LF $ 13.00 27 351.00 <br /> 1" COPPER WATER SERVICE LF $ 10.00 320 3,200.00 <br /> 1" COPPER SERVICE DIRECTIONAL DRILL LF $ 35.00 300 10,500.00 <br /> RECONNECT WATER SERVICE EA $ 200.00 1 200.00 <br /> 1' CURB STOP & BOX EA $ 125.00 7 875.00 <br /> 1" CORPORATION EA $ 75.00 8 600.00 <br /> SUBTOTAL $21,561.00 <br /> 5% CONTINGENCY $1,070.00 <br /> TOTAL CONSTRUCTION COST $22,631.00 <br /> 30% INDIRECT COSTS $6,695.00 <br /> TOTAL COST - SERVICES - CENTERVILLE ROAD $29,326.00 <br /> • <br /> BRAA A -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.