Laserfiche WebLink
UNIT <br /> ITEM UNIT PRICE QUANTITY TOTAL <br /> PART G - STORM SEWER - HUNTERS CROSSING <br /> 12" RCP, CL. 5 STORM SEWER LF $ 20.00 295 $5,900.00 <br /> 15" HDPE STORM SEWER LF $ 21.00 215 4,515.00 <br /> 18" RCP, CL. 4 STORM SEWER LF $ 24.00 355 8,520.00 <br /> 21" RCP, CL. 3 STORM SEWER LF $ 26.00 160 4,160.00 <br /> IMPROVED PIPE FOUNDATION LF $ 2.00 970 1,940.00 <br /> CATCH BASIN W/BEEHIVE EA $1,200.00 1 1,200.00 <br /> CATCH BASIN EA $ 1,200.00 2 2,400.00 <br /> CATCH BASIN MANHOLE EA $ 1,400.00 5 7,000.00 <br /> POND OUTLET STRUCTURE EA $ 1,500.00 2 3,000.00 <br /> WOOD SKIMMER STRUCTURE EA $ 2,000.00 1 2,000.00 <br /> 12" RCP FLARED END SECTION EA $ 600.00 2 1,200.00 <br /> 15" HDPE FLARED END SECTION EA $ 500.00 2 1,000.00 <br /> 18" RCP FLARED END SECTION EA $ 750.00 3 2,250.00 <br /> 21" RCP FLARED END SECTION EA $ 900.00 1 900.00 <br /> ROCK RIPRAP, CL. 3 CY $ 50.00 30 1,500.00 <br /> SODDING SY $ 4.00 500 2,000.00 - <br /> SUBTOTAL $49,485.00 <br /> 5% CONTINGENCY $2,470.00 <br /> TOTAL CONSTRUCTION COST $51,955.00 <br /> 30% INDIRECT COSTS $15,590.00 <br /> I I <br /> TOTAL COST - STORM SEWER - HUNTERS CROSSING $67,545.00 <br /> PART H - STREET - HUNTERS CROSSING <br /> COMMON EXCAVATION CY $ 6.00 2200 $13,200.00 <br /> SUBGRADE PREPARATION RD STA $ 150.00 24 3,600.00 <br /> GRANULAR BORROW (CV) CY $ 10.00 5000 50,000.00 <br /> AGGREGATE BASE, CL. 5 TN $ 8.50 3300 28,050.00 <br /> BITUMINOUS BASE COURSE TN $ 31.00 700 21,700.00 <br /> BITUMINOUS WEAR COURSE TN $ 33.00 700 23,100.00 <br /> BITUMINOUS MATERIAL FOR TACK COAT GAL $ 2.00 400 800.00 <br /> SURMOUNTABLE CONC. CURB AND GUTTER LF $ 6.50 4260 27,690.00 <br /> BITUMINOUS TRAIL LF $ 12.00 1200 14,400.00 <br /> BARRICADES EA $ 500.00 2 1,000.00 <br /> 4" POLY DRAIN TILE LF $ 6.00 4260 25,560.00 <br /> GEOTEXTILE FABRIC SY $ 1.50 9000 13,500.00 <br /> SEEDING W/TOPSOIL AND MULCH AC $ 2,000.00 1.5 3,000.00 <br /> SUBTOTAL $225,600.00 <br /> 5% CONTINGENCY $11,280.00 <br /> TOTAL CONSTRUCTION COST $236,880.00 <br /> 30% INDIRECT COSTS $71,060.00 <br /> TOTAL COST - STREET - HUNTERS CROSSING $307,940.00 <br /> BRAA A -4 <br />