Laserfiche WebLink
Comments from Dick: <br /> Div. 50 <br /> Is this supposed to be an increase from what it is now? Also do we need number of? <br /> Div. 65 <br /> Does this need to address roof height? <br /> Section 070 -010 <br /> When are registrations and or certifications required? <br /> Section 080 -060 <br /> Are duplex style homes supposed to be included in this zoning? <br /> Section 080 -090 <br /> Why are full service gas stations and not self? Is oriented miss - spelled? <br /> Section 080 -120 <br /> Where is this planned? <br /> Division 85 <br /> Why is this necessary? <br /> Division 115 -010 <br /> Measured from where? <br /> Section 140 Residential C. <br /> Maximum of one, sideyard or rearyard only. If there is two recreational vehicles in one driveway it will <br /> create a fire safety hazard. Ice house is an accessory structure isn't it? <br /> Division 150 <br /> RCWD is a lot stricter, couldn't we defer to their regulations? <br /> Division 165 -010 <br /> Some of the zoning classes are not relevant. <br /> Division 170 -070 <br /> Will all of downtown ever be in compliance? <br /> Section 185 -160 Subd. 2 <br /> If any <br /> Section 190 -020 D. <br /> Recommend approval or denial <br /> I was told the City of Centerville has a rule regarding the engineering of projects with -in the City will be <br /> completed by the Consulting firm the City contracts with. I did not see this issue addressed. <br />