Laserfiche WebLink
r <br /> rag <br /> � AIDRIC <br /> CORPORATION <br /> 2622 2? cane NEMahe, MN 55449 <br /> to City of Centerville - Paul Patter Pages: 2 <br /> Fero 7834714735 Date: September 18, 2008 <br /> Phan: 783871 -7287 Run Brian rora <br /> wt4 <br /> Ra illtsteOen transfer switch Install bdateldalearlarepaom <br /> Paul, <br /> Per site review - we are pleased to provide the below cost for the install of a manual transfer switch <br /> including: r <br /> Option #1 with 1- 200-amp cord and plus: <br /> s <br /> • • Provide and install one 200-amp, Non - Fused, N3 manual transfer switch mounted on the <br /> exterior of the existing control cabinet <br /> • Provide and install 1- 200-amp receptacle (with S22 configuration) on the bottom of the transfer <br /> switch -a <br /> • Provide 50 feet of 200 -amp 4 conductor cord with Plug (and S22 configuration) <br /> • Install new wiring from cabinet to Transfer switch <br /> • Permit fee <br /> Cost not to exceed $6,020.00 <br /> • <br /> • <br /> Option #2 with 2 - 100amo cords and plugs: <br /> • Provide and Install 1 200 -amp, Non - Fused, N3 manual transfer switch mounted on the exterior <br /> of the existing control cabinet <br /> • Provide and Stall 2 - 100 -amp receptacles (with S22 configuration) on the bottom of the <br /> transfer switch <br /> • Provide (quantity 2) 50 feet of 100-amp 4 conductor cord with Plug (and S22 configuration) <br /> • Install new wtring from cabinet to Transfer switch <br /> • Permit fee <br /> Cost not to exceed $4,778.00 <br /> 17 <br />