| 
								    									     	Bidder No. 1		 	Bidder No. 2		 	Bidder No. 3		 	Bidder No. 4
<br />			  	BID TABULATION				     	Rum River Contracting Co	 	Forest Lake Contracting Inc		KnBe Ricer Corporation - North    	Diesel Contracting Inc
<br />     	Item															     	Central
<br />     	Num		     	Item				Units	 	Qty		Unit Prins	 	Total	 	Unit Price	 	Total	 	Unit Price	 	Total	 	Unit Price	 	Total
<br />     	123   	6" YARD DRAIN				  	EA	     	12		534.12	  	5409.44     	5140.00	 	51,680.00     	5150.00	 	51,800.00     	$150.00	 	51,800.00
<br />     	124   	6" RODENT CAP				  	EA			2		529.68	  	55936		522.00	   	344.00     	5110.00	  	5220.00		150.00	  	5100.00
<br />     	125   	5" BLACK POLYETHYLENE LAWN EDGING	     	LF	    	300	 	53.00	  	5900.00	 	55.00	 	51,500.00	 	54.00	 	51,200.00	 	55.00	 	$1,500.00
<br />     	126   	1 1/2" WASHED RIVER ROCK				CY	    	100		525.00	 	52,500.00		560.00	 	56,000.00		530.00	 	53,000.00     	5125.00		512,500.00
<br />     	127   	CLASS 01 RANDOM RIPRAP			  	CY	     	16		576.00	 	51,216.00		580.00	 	11,280.00		580.00	 	51,280.00     	5100.00	 	51,600.00
<br />     	128   	TOPSOIL BORROW (IV)			    	CY	     	45		512.95	  	5582.75		530.00	 	51,350.00		518.75	  	5843.75		51500	  	$675.00
<br />     	129   	SODDING, LAWN TYPE			    	SY	   	2500	 	52.20	 	55,500.00	 	54.00		510,00000	 	52.55	 	56,375.00	 	52.60	 	56,500.00
<br />     	130   	FINAL GRADING AND SHAPING BACKYARDS - 73RD
<br />	   	STREET AREA				    	SY	    	450	 	51.00	  	5450.00	 	51.00	  	5450.00	 	55.00	 	52,250.00	 	54.00	 	51,800.00
<br />     	131   	FINAL GRADING AND SHAPING BACKYARDS -
<br />	   	QUEBEC STREET AREA			    	SY	    	1150	 	51.00	 	51,150,00	 	11.00	 	51,150.00	 	55.00	 	55,750.00	 	54.00	 	54,600.00
<br />     	132   	FINAL GRADING AND SHAPING BACKYARDS -
<br />	   	BRIAN DRIVE AREA					SY	    	900	 	51.00	  	5900.00	 	51.00	  	5900.00	 	55.00	 	54,500.00	 	54.00	 	53,600.00
<br />	   	TOTAL PART 4- BACKYARD DRAINAGE						    	538,27192		    	581,354.00		   	562,851.25		   	576,978.50
<br />	   	IMPROVEMENTS - BRIAN DRIVE, 73RD STREET,
<br />	   	AND QUEBEC STREET AREAS
<br />	   	BASE BID:
<br />	   	TOTAL PART 1 - PROJECT MANAGEMENT						   	528,400.00		    	526,000.00		    	543,450.00		   	549,000.00
<br />	   	TOTAL PART 2 - TYPE 01 & IV IMPROVEMENTS -
<br />	   	73RD STREET, 72ND STREET, UNITY STREET, 72ND
<br />	   	1/2 STREET, TWIN LAKES AVENUE, BRIAN DRIVE,
<br />	   	PRAIRIE DRIVE, AND PETERSON TRAIL AREAS							5959,614,65		  	51,006,442.00		   	5969,230.50		   	5992,453.25
<br />	   	TOTAL PART 3 - TYPE V IMPROVEMENTS - CLEAR
<br />	   	RIDGE, GRANGE VIEW, BRIAN WAY, BRIAN DRIVE,
<br />	   	AND FOX RUN AREAS								  	5239,731.52		   	5223,941.25		   	5281,638.45
<br />	   	TOTAL PART 4 - BACKYARD DRAINAGE																	    	5249,666.00
<br />	   	IMPROVEMENTS - BRIAN DRIVE, 73RD STREET, AND
<br />	   	QUEBEC STREET AREAS								  	538,271.92		    	581,354.00		    	562,851.25		    	576,978.50
<br />	   	TOTAL BASE BID								    	51,266,01809		  	51,337,737.25		  	51,357,170.20		  	51,368,097.75
<br />	   	ALTERNATE NO. 1 - FUNDING AGENCY
<br />	   	REQUIREMENTS:
<br />     	133   	ADDITIONAL COMPENSATION NEEDED IF FUNDING
<br />	   	AGENCY REQUIREMENTS ARE ADDED TO THE JOB		LS			1    	No Bid	 	No Bid	 	514,000.00		514.000.00    	55,000.00	 	$5,000.00   	525,000.00		525,000.00
<br />													No Bld			 	514,000.00		    	5500000
<br />	   	TOTAL ALTERNATE NO, 1 - FUNDING AGENCY													    	,.
<br />	   	REQUIREMENTS																					525,000.OQ
<br />	    	00061609170013T.>ds								    	8T -5
<br />
								 |