Bidder No. 5 Bidder No. 6
<br /> BID TABULATION TowerAsphait Inc T A Sddhky & Sax Inc
<br /> him
<br /> Nom Item Units Qty Unit Rice Total Unit Price Total
<br /> PART 1 - PROJECT MANAGEMENT:
<br /> I MOBIUZATION LS 1 554,415.00 554,415.00 555,500.00 555,500.00
<br /> 2 TRAFFIC CONTROL 15 1 55,000.00 55,000.00 $6,400.00 56.400.00
<br /> TOTAL PART 1- PROJECT MANAGEMENT 159,415.00 161,900.00
<br /> PART 2 - TYPE III & IV IMPROVEMENTS - 73RD
<br /> STREET, 72ND STREET, UNITY STREET, T2N0112
<br /> STREET, TWIN LAKES AVENUE, BRIAN DRIVE,
<br /> PRAIRIE DRIVE, AND PETERSON TRAIL AREAS:
<br /> 3 TEMPORARY ROCK CONSTRUCTION ENTRANCE TN 50 519.00 5950.00 515.45 5772.50
<br /> 4 SILT FENCE, MACHINE SLICED LF 1700 52.00 53,400.00 51.70 52,890.00
<br /> 5 REMOVE BITUMINOUS PAVEMENT SY 29300 52.60 576,180.00 51.49 543,657.00
<br /> 6 REMOVE CONCRETE CURB AND GUTTER LF 2250 52.00 54,500.00 52.06 54,635.00
<br /> 7 REMOVE BITUMINOUS DRIVEWAY SY 375 52.50 593750 52.32 5870.00
<br /> 8 REMOVE CONCRETE DRIVEWAY PAVEMENT SY 50 53.50 5175.00 54.12 5206.00
<br /> 9 REMOVE STORM SEWER PIPE LF 100 58.00 5800.00 55.15 5515.00
<br /> 10 REMOVE TREE EA 10 5120.00 51,200.00 5128.75 51,287.50
<br /> 11 REMOVE STORM SEWER CATCH BASIN MANHOLE EA 4 5325.00 51,300.00 5206.00 5824.00
<br /> 12 BOLT REPLACEMENT - HYDRANT AND GATE VALVE EA 15 51,495.00 522,425.00 52,060.00 530,900.00
<br /> 13 BOLT REPLACEMENT - GATE VALVE EA 24 5995.00 523,880.00 51545.00 537,080.00
<br /> 14 SALVAGE AND REINSTALL IRRIGATION LINES IF 250 52.50 5625.00 52.06 5515.00
<br /> IS SALVAGE AND REINSTALL IRRIGATION HEADS EA 10 545.00 5450.00 587.55 5875.50
<br /> 16 ADJUST EXISTING CURB BOX EA 10 5200.00 52,000.00 587.55 5875.50
<br /> 17 ADJUST EXISTING VALVE BOX EA 23 5200.00 54,600.00 566.95 51,539.85
<br /> 18 ADJUST EXISTING SANITARY SEWER MANHOLE
<br /> FRAME AND RING CASTING EA 39 5665.00 525,935.00 5375.95 514,662.05
<br /> 19 ADJUST EXISTING STORM SEWER CATCHBASIN
<br /> FRAME AND RING CASTING EA 7 5665.00 54,655.00 5283.25 51,982.75
<br /> 20 ADJUST EXISTING STORM SEWER CATCHBASIN
<br /> MANHOLE FRAME AND RING CASTING EA 16 5665.00 510,640.00 5372.86 55,965.76
<br /> 21 RECONSTRUCT SANITARY MANHOLE LF 11 5150.00 51,650.00 5257.50 52,832.50
<br /> 22 RECONSTRUCT EXISTING VALVE BOX EA 7 5295.00 52,065.00 5257.50 51,802.50
<br /> 23 GROUT EXISTING STRUCTURE, INCL DOGHOUSES,
<br /> INVERTS, BENCHES EA 25 5225.00 55,625.00 5180.25 54,506.25
<br /> 24 SAWING BITUMINOUS PAVEMENT LF 775 52.00 51,550.00 51.55 51,201.25
<br /> 25 SAWING CONCRETE PAVEMENT LF 50 53.00 5150.00 54.12 5206.00
<br /> 26 MILL BITUMINOUS CONSTRUCTION JOINT LF 300 51.00 5300.00 56.18 51,854.00
<br /> 27 REMOVE EXISTING 18' TRASH GUARD EA 1 565,00 565.00 551.50 551.50
<br /> 28 CLEAN EXISTING STORM PIPE LF 300 510.00 53,000.00 53.09 5927.00
<br /> 000616091700BT.xls BT -7